A REVIEW OF MULTI-CRITERION APPROACHES TO FMS SCHEDULING PROBLEMS

被引:24
作者
GUPTA, YP
EVANS, GW
GUPTA, MC
机构
[1] Department of Management, University of Louisville, Louisville
[2] Department of Industrial Engineering, University of Louisville, Louisville
[3] Department of Management, University of Louisville, Louisville
关键词
66;
D O I
10.1016/0925-5273(91)90032-O
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An increasing number of organizations are implementing Flexible Manufacturing Systems (FMSs) to achieve competitive advantage. The implementation process can be viewed in a hierarchical perspective: ranging from design problems at the top level to scheduling and control problems at the lower level. In recent years, researchers have focused a significant amount of attention on FMS scheduling problems. However, the major share of those studies considered FMS scheduling in the context of a single performance criterion. Though several researchers have synthesized the literature involving single criteria, the literature with multi-criterion approaches has not been consolidated and reviewed. Therefore, the purpose of this paper is to explore the applicability of multi-criterion approaches to the production scheduling problems of an FMS and review the pertinent literature on FMS scheduling involving multiple objectives. Some areas for future research are also identified.
引用
收藏
页码:13 / 31
页数:19
相关论文
共 66 条
  • [31] Foote, Ravindran, Lashine, Production planning & scheduling, Computers & Industrial Engineering, 15, (1988)
  • [32] Kornbluth, A survey of goal programming, Omega, 1, (1973)
  • [33] Zanakis, Gupta, A categorized bibliographic survey of goal programming, Omega, 13, 3, (1985)
  • [34] Kornbluth, Sequential multi-criterion decision making, Omega, 13, (1985)
  • [35] Osyczka, Multicriterion optimization in engineering, (1984)
  • [36] Stecke, Production Planning Problems for FMS, Ph.D. Dissertation, (1981)
  • [37] Chung, Loading flexible manufacturing systems: a heuristic approach, Proc. 8th Ann. Conf. Comput. Ind. Eng., pp. 246-250, (1987)
  • [38] O'Grady, Menon, A MULTIPLE CRITERIA APPROACH FOR PRODUCTION PLANNING OF AUTOMATED MANUFACTURING, Engineering Optimization, 8, pp. 161-175, (1985)
  • [39] Kumar, Singh, Tewari, Multicriterion analysis of the loading problem in flexible manufacturing systems using min-max approach, Int. J. Adv. Manuf. Technol., 2, pp. 13-20, (1987)
  • [40] Kumar, Singh, Tewari, A NONLINEAR GOAL PROGRAMMING MODEL FOR THE LOADING PROBLEM IN A FLEXIBLE MANUFACTURING SYSTEM, Engineering Optimization, 12, pp. 315-323, (1987)