A REVIEW OF MULTI-CRITERION APPROACHES TO FMS SCHEDULING PROBLEMS

被引:24
作者
GUPTA, YP
EVANS, GW
GUPTA, MC
机构
[1] Department of Management, University of Louisville, Louisville
[2] Department of Industrial Engineering, University of Louisville, Louisville
[3] Department of Management, University of Louisville, Louisville
关键词
66;
D O I
10.1016/0925-5273(91)90032-O
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An increasing number of organizations are implementing Flexible Manufacturing Systems (FMSs) to achieve competitive advantage. The implementation process can be viewed in a hierarchical perspective: ranging from design problems at the top level to scheduling and control problems at the lower level. In recent years, researchers have focused a significant amount of attention on FMS scheduling problems. However, the major share of those studies considered FMS scheduling in the context of a single performance criterion. Though several researchers have synthesized the literature involving single criteria, the literature with multi-criterion approaches has not been consolidated and reviewed. Therefore, the purpose of this paper is to explore the applicability of multi-criterion approaches to the production scheduling problems of an FMS and review the pertinent literature on FMS scheduling involving multiple objectives. Some areas for future research are also identified.
引用
收藏
页码:13 / 31
页数:19
相关论文
共 66 条
  • [1] Jaikumar, Post industrial manufacturing, Harv. Bus. Rev., 6, pp. 69-76, (1986)
  • [2] Choobineh, FMS: A totally programmable manufacturing cell, Flexible Manufacturing Systems, pp. 31-43, (1986)
  • [3] Groover, Automation, Production Systems, and Computer-Aided Manufacturing, (1985)
  • [4] Browne, Dubois, Sethi, Rathmill, Stecke, Classification of flexible manufacturing systems, FMS Mag, (1984)
  • [5] Yilmaz, Davis, Flexible manufacturing systems: characteristics and assessment, Eng. Manage. J., 4, (1987)
  • [6] Buzacott, Yao, Flexible manufacturing systems: A review of analytical models, Manage. Sci., 32, 7, pp. 890-905, (1986)
  • [7] Rachamadugu, Stecke, Classification and review of FMS scheduling procedures, Working Paper #481 c, (1988)
  • [8] Gupta, Gupta, Bector, A review of scheduling rules in flexible manufacturing systems, International Journal of Computer Integrated Manufacturing, 2, 6, pp. 356-377, (1990)
  • [9] Stecke, Talbot, Heuristics for loading flexible manufacturing systems, Flexible Manufacturing Systems, (1985)
  • [10] Smith, Ramesh, Dudek, Blair, Characteristics of US flexible manufacturing systems-survey, Proc. 2nd ORSA/TIMS Conf. FMS, pp. 477-486, (1986)