A PETRI-NET BASED APPROACH FOR SCHEDULING AND RESCHEDULING RESOURCE-CONSTRAINED MULTIPLE PROJECTS

被引:6
|
作者
Kao, Hsing-Pei [1 ]
Hsieh, Ben [1 ]
Yeh, Yingchieh [1 ]
机构
[1] Natl Cent Univ, Inst Ind Management, Chungli 320, Taiwan
关键词
multi-project management; event-driven scheduling; high level Petri nets;
D O I
10.1080/10170660609509343
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Recently, multi-project management has become prevalent. However, the execution of multi-project is subject to considerable uncertainty ( such as the addition of new projects or the removal of withdrawn projects) that may lead to schedule disruptions. This study adopts an event-driven approach whereby all projects are grouped as a dynamic network which will be modified and rescheduled in response to significant events in terms of urgency and seriousness. Regarding the need to assign resources to every project over time and avoid conflicts due to resource contention, this study applies high level Petri nets to simulate the multi-project network, thus generates a schedule that minimizes makespan while preserving resource feasibility.
引用
收藏
页码:468 / 477
页数:10
相关论文
共 50 条
  • [1] A Novel Petri-Net Based Resource Constrained Multi-project Scheduling Method
    Hu, Wenbin
    Wang, Huan
    ALGORITHMS AND ARCHITECTURES FOR PARALLEL PROCESSING, ICA3PP 2014, PT I, 2014, 8630 : 270 - 284
  • [2] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [3] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [4] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [5] Performance analysis of scheduling rules in resource-constrained multiple projects
    Kanagasabapathi, Balasubramanian
    Rajendran, Chandrasekharan
    Ananthanarayanan, Kuppuswamy
    International Journal of Industrial and Systems Engineering, 2009, 4 (05) : 502 - 535
  • [6] Resource-Constrained Multiple Projects Scheduling with the Objective of Minimizing Activities Cost
    Liu, Zhenyuan
    Zheng, Yanqi
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1027 - 1032
  • [7] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [8] Resource-based petri-net scheduling optimization for wafer fabrication systems
    School of Economics and Management, Tongji University, Shanghai 200092, China
    不详
    Tongji Daxue Xuebao, 2008, 5 (674-679): : 674 - 679
  • [9] Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems
    Brcic, Mario
    Katic, Marija
    Hlupic, Nikica
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (01) : 58 - 66
  • [10] Scheduling multiple, resource-constrained, iterative, product development projects with genetic algorithms
    Yassine, Ali A.
    Mostafa, Omar
    Browning, Tyson R.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 39 - 56