Adaptive policies for short-term material flow optimization in a mining complex

被引:15
作者
Paduraru, Cosmin [1 ]
Dimitrakopoulos, Roussos [1 ]
机构
[1] McGill Univ, Dept Min & Mat Engn, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Mining complex; geological uncertainty; incorporating new information; short-term planning;
D O I
10.1080/14749009.2017.1341142
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
With the advent of inexpensive sensors and digital storage, increasing amounts of data about a mining complex can be collected.This data can, in turn, be used to continuously adapt stochastic optimization models and short-term mining decision making, thus reducing and managing local uncertainty. Taking advantage of this uncertainty reduction requires new decision-making approaches, mechanisms, and optimization methods. This paper proposes the use of state-dependent policies, which encode recipes for responding to new information as it comes along. Focusing on short-term planning shows how to represent and optimize state-dependent policies for making adaptive destination decisions for materials mined and processed. Resulting policies can be applied across different short-term time scales, marking an important step towards simultaneously optimizing different time scales. An implementation of the proposed method at a copper-gold deposit shows that it can improve the utilization of processing streams, production and financial performance over simple heuristic approaches and practices.
引用
收藏
页码:56 / 63
页数:8
相关论文
共 35 条
[1]   Using multistage stochastic optimisation to manage major production incidents [J].
Armstrong, M. ;
Galli, A. ;
Razanatsimba, R. .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2012, 121 (03) :125-131
[2]   Recent Developments in Closed-Loop Approaches for Real-Time Mining and Petroleum Extraction [J].
Benndorf, Joerg ;
Jansen, Jan Dirk .
MATHEMATICAL GEOSCIENCES, 2017, 49 (03) :277-306
[3]  
Boland N., 2008, OPTIMIZATION
[4]   Block Simulation of Multiple Correlated Variables [J].
Boucher, Alexandre ;
Dimitrakopoulos, Roussos .
MATHEMATICAL GEOSCIENCES, 2009, 41 (02) :215-237
[5]  
Brochu E., 2010, COMPUTER SCI, DOI 10.48550/arxiv.1012.2599
[6]   Vision-based rock-type classification of limestone using multi-class support vector machine [J].
Chatterjee, Snehamoy .
APPLIED INTELLIGENCE, 2013, 39 (01) :14-27
[7]  
Defourny B, 2012, DECISION THEORY MODELS FOR APPLICATIONS IN ARTIFICIAL INTELLIGENCE: CONCEPTS AND SOLUTIONS, P97, DOI 10.4018/978-1-60960-165-2.ch006
[8]   Joint effect of commodity price and geological uncertainty over the life of mine and ultimate pit limit [J].
Del Castillo, Fernanda ;
Dimitrakopoulos, Roussos .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2014, 123 (04) :207-219
[9]  
Del Moral P., 1996, MARKOV PROCESS RELAT, V2, P555
[10]  
Dimitrakopoulos, 2014, OREBODY MODELLING ST, V132014, P223