Heuristics for Determining Module Stocks in Assemble-to-order Systems

被引:0
作者
da Cunha, Catherine [1 ]
Frein, Yannick [2 ]
机构
[1] IRCCyN, 1 Rue Noe,BP 92101, F-44321 Nantes 03, France
[2] INP Grenoble UJF CNRS, Lab G SCOP, F-38031 Grenoble 1, France
关键词
Production; Information; Heuristics; Assemble-to-Order;
D O I
10.3166/JDS.17.403-424
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In an assemble-to-order context, the choice of a modular design is of paramount importance. The selection of the semi-finished products that would be kept in stock, indeed impacts the whole supply chain (storage, transport, production, etc.). In this article, this lever is used to minimize, for a given number of stocked modules, the mean final assembly time. The choice of a stock composition has to be done according to the information about the demand; the major issue is to address this problem when the demand is not totally known. Here, an original modelling that enables to integrate this aspect is proposed. This combinatorial optimization problem is addressed using heuristics. The performances of the proposed heuristics are evaluated trough computational tests with different repartition of demands. Furthermore, the heuristics are studied when dealing with partial information about final demand. Results show that the heuristics are pertinent; they also stress the impact on performances of information acquisition.
引用
收藏
页码:403 / 424
页数:22
相关论文
共 50 条
  • [31] Dual-channel component replenishment problem in an assemble-to-order system
    Yao, Zhishuang
    Lee, Loo Hay
    Chew, Ek Peng
    Hsu, Vernon N.
    Jaruphongsa, Wikrom
    IIE TRANSACTIONS, 2013, 45 (03) : 229 - 243
  • [32] An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing
    Wang B.
    Guan Z.
    Chen Y.
    Shao X.
    Jin M.
    Zhang C.
    Frontiers of Mechanical Engineering, 2013, 8 (2) : 137 - 145
  • [33] On the use of independent base-stock policies in assemble-to-order inventory systems with nonidentical lead times
    Reiman, Martin I.
    Wan, Haohua
    Wang, Qiong
    OPERATIONS RESEARCH LETTERS, 2016, 44 (04) : 436 - 442
  • [34] Response time reduction in make-to-order and assemble-to-order supply chain design
    Vidyarthi, Navneet
    Elhedhli, Samir
    Jewkes, Elizabeth
    IIE TRANSACTIONS, 2009, 41 (05) : 448 - 466
  • [35] Optimal control of a nested-multiple-product assemble-to-order system
    Elhafsi, Mohsen
    Camus, Herve
    Craye, Etienne
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (19) : 5367 - 5392
  • [36] Technical Note-Error Noted in "Order-Based Cost Optimization in Assemble-to-Order Systems" by Lu and Song (2005)
    Bolandnazar, Mohammadreza
    Huh, Woonghee Tim
    McCormick, S. Thomas
    Murota, Kazuo
    OPERATIONS RESEARCH, 2019, 67 (01) : 163 - 166
  • [37] Product quality selection: Contractual agreements and supplier competition in an assemble-to-order environment
    Altug, Mehmet Sekip
    van Ryzin, Garrett
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (02) : 626 - 638
  • [38] The Research on the Method of Constructing BOM for Small and Medium Assemble-to-Order Manufacturing Enterprises
    Ding, Xiang-hai
    Shi, Jing-jing
    ADVANCED COMPOSITE MATERIALS, PTS 1-3, 2012, 482-484 : 2174 - 2178
  • [39] Product selection and pricing policy of assemble-to-order manufacturer based on heterogeneous demands
    Li Y.
    Huang B.
    Huang H.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (07): : 2263 - 2272
  • [40] Component-based product knowledge modeling and management for assemble-to-order enterprise
    Zhang, JS
    Zheng, SY
    Xue, CF
    Proceedings of the 2005 International Conference on Management Science and Engineering, 2005, : 785 - 792