The impact of contractors' management capability on cost and time performance of construction projects in Nigeria

被引:22
作者
Aje, O. [1 ]
Odusami, K. [2 ]
Ogunsemi, D. [1 ]
机构
[1] Fed Univ Technol Akure, Sch Environm Technol, Dept Quality Surveying, Akure, Nigeria
[2] Univ Lagos, Fac Environm Studies, Dept Bldg, Akoka, Nigeria
关键词
Construction industry; Costs; Management skills; Time-based management; Nigeria;
D O I
10.1108/13664380910977619
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - Management capability is one of the major criteria for evaluating construction contractors during prequalification and tender evaluation This paper aims to investigate the impact of contractors' management capability as a prequalification criterion on cost and time performance of selected building projects. Design/methodology/approach - Prequalification assessments of management capability of wining contractors as well as cost data relating to 77 completed building projects executed between 2004 and 2007 are obtained. The data obtained from a questionnaire and archival data are analyzed using one-way analysis of variance and multiple regression. Findings - The results reveal that contractors' management capability has significant impact on cost and time performance of building projects as evidenced by p-values of 0.042 and 0.039, respectively. Practical implications - The research could be of significant benefit at the research implementation stage of public procurement practice especially in relation to the construction industry in Nigeria. Construction practitioners involved in prequalification and tender evaluation should continue to seek relevant information relating to management capability from the candidate contractors during prequalification and tender evaluation. Originality/value - Models capable of predicting the final cost and duration of building projects are eventually derived based on prequalification assessment of contractors on management capability, proposed contract duration and the initial contract figure. The goodness of fit of the models as defined by the value of R-2 is found to be 96.2 percent and 90.01 percent for cost and time, respectively; thus signifying high predictive efficacy of the models.
引用
收藏
页码:171 / +
页数:18
相关论文
共 41 条
  • [31] Predicting the trends and cost impact of COVID-19 OSHA citations on US construction contractors using machine learning and simulation
    Sadeh, Hooman
    Mirarchi, Claudio
    Shahbodaghlou, Farzad
    Pavan, Alberto
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (08) : 3461 - 3479
  • [32] Quantifying the impact of cost-based incentives on the performance of building projects in the United States
    Chokor A.
    El Asmar M.
    Paladugu B.S.
    Practice Periodical on Structural Design and Construction, 2017, 22 (02)
  • [33] Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications
    Adam, Abderisak
    Josephson, Per-Erik Bertil
    Lindahl, Goran
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) : 393 - 406
  • [34] Influence of Human Resources Management Practices on Organisational Performance of Construction Firms in Lagos State - Nigeria
    Jimoh, Richard
    Ihedigbo, Kingsley
    Oyewobi, Luqman
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (04): : 437 - 446
  • [35] The Relationship between Projects Management Managers' Competencies and Employees' Performance of Construction Industry at Gaza Strip
    El Sawalhi, Nabil
    Lafy, Ramy
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (02): : 38 - 52
  • [36] Impact of total quality management on the sustainable performance in the Palestinian construction industry
    Jabi, Ismael
    Faour, Maryana
    Saleh, Yahya
    TQM JOURNAL, 2024,
  • [37] Probing the Effect of Business Intelligence on the Performance of Construction Projects Through the Mediating Variable of Project Quality Management
    Golestanizadeh, Mahboobeh
    Sarvari, Hadi
    Parishani, Amirhossein
    Akindele, Nelson
    Edwards, David J.
    BUILDINGS, 2025, 15 (04)
  • [38] Public Assessment for Environmental Management Plan Implementation: Comparative Study of Performance Indicators of Road and Highway Construction Projects
    Dahalan, Nurol Huda
    Rahman, Rahimi A.
    Hassan, Siti Hafizan
    Ahmad, Saffuan Wan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (07)
  • [39] Mediating Effects of Enforcement on Public Procurement Guidelines' Compliance Barriers and Cost Performance of Construction Projects in Nigerian Federal Universities: A Process Macro Approach
    Zadawa, Abdullahi Nafiu
    Hussin, Abdul Aziz
    Osmadi, Atasya
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2018, 23 (01) : 81 - 102
  • [40] Modelling the impact of outsourcing decisions on facilities management service-level performance: a case of Nigeria's public hospitals
    Ikediashi, Dubem
    Mbamali, Ikemefuna
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (11) : 1130 - 1147