共 41 条
- [21] Cost Control Management of Construction Projects Based on Fuzzy Logic and Auction Theory IEEE ACCESS, 2024, 12 : 130292 - 130304
- [26] Consequences in cost and time in construction projects due to the low level of BIM methodology use REVISTA INGENIERIA DE CONSTRUCCION, 2024, 39 (02): : 151 - 160
- [29] Impact of Rework on Building Project and Organisation Performance: A View of Construction Professionals in Nigeria INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 29 - 43