A fuzzy integrated approach for project selection

被引:8
|
作者
Bolat, Bersam [1 ]
Cebi, Ferhan [1 ]
Temur, Gul Tekin [1 ]
Otay, Irem [1 ]
机构
[1] Istanbul Tech Univ, Management Engn, Istanbul, Turkey
关键词
Information systems; Project selection; Fuzzy analytical hierarchical process; Fuzzy multi-objective linear programming; Multi-criteria decision making;
D O I
10.1108/JEIM-12-2013-0091
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Purpose - The purpose of this paper is to develop a systematic and comprehensive project selection model utilizing fuzzy multi-objective linear programming (FMOLP) that deals with the imprecise data in IS projects and uncertain judgment of decision makers. Design/methodology/approach - First, projects are prioritized by considering both quantitative and qualitative factors. A fuzzy analytical hierarchical process (FAHP) is used in order to obtain weights of each project that indicates their priorities. At the second step, project selection decision is completed by using FMOLP. Then, the sensitivity analysis is performed to evaluate the robustness of the proposed integrated model. Findings - The result of this study indicates that an integrated approach utilizing FAHP and FMOLP can be used as a supportive tool for project selection in IS context. It decreases the uncertainty caused from uncertain judgment of decision makers. Research limitations/implications - Future studies are suggested to design models having fuzzy constraints such as budget and resources. Moreover, for future studies, non-linear membership functions can be used. Practical implications - Actual projects are provided from the Turkish IS company for prioritizing process and a hypothetical mathematical model is demonstrated using illustrative data. Originality/value - This study contributes to the relevant literature by proposing a comprehensive model considering many conflicting ideas of decision makers on quantitative and qualitative criteria, and evaluating projects in an integrated way including FAHP and FMOLP.
引用
收藏
页码:247 / +
页数:15
相关论文
共 50 条
  • [31] One approach for road transport project selection
    Ivanovic, Ivan
    Grujicic, Dragana
    Macura, Dragana
    Jovic, Jadranka
    Bojovic, Nebojga
    TRANSPORT POLICY, 2013, 25 : 22 - 29
  • [32] A fuzzy AHP-based methodology for project prioritization and selection
    Amir Shaygan
    Özlem Müge Testik
    Soft Computing, 2019, 23 : 1309 - 1319
  • [33] An intuitionistic fuzzy entropy approach for supplier selection
    Mohamadtaghi Rahimi
    Pranesh Kumar
    Behzad Moomivand
    Gholamhosein Yari
    Complex & Intelligent Systems, 2021, 7 : 1869 - 1876
  • [34] An intuitionistic fuzzy entropy approach for supplier selection
    Rahimi, Mohamadtaghi
    Kumar, Pranesh
    Moomivand, Behzad
    Yari, Gholamhosein
    COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (04) : 1869 - 1876
  • [35] A Fuzzy TODIM Approach for the Supplier Selection Problem
    Tosun, Omur
    Akyuz, Gokhan
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2015, 8 (02) : 317 - 329
  • [36] A Fuzzy TODIM Approach for the Supplier Selection Problem
    Ömür Tosun
    Gökhan Akyüz
    International Journal of Computational Intelligence Systems, 2015, 8 : 317 - 329
  • [37] Portfolio selection: a fuzzy-ANP approach
    Galankashi, Masoud
    Rafiei, Farimah
    Ghezelbash, Maryam
    FINANCIAL INNOVATION, 2020, 6 (01)
  • [38] Fuzzy Distance-Based Approach for the Assessment and Selection of Programming Languages: Fuzzy-Based Hybrid Approach for Selection of PL
    Garg, Rakesh
    Raheja, Supriya
    INTERNATIONAL JOURNAL OF DECISION SUPPORT SYSTEM TECHNOLOGY, 2023, 15 (01)
  • [39] An Integrated Delphi-AHP and Fuzzy TOPSIS Approach toward Ranking and Selection of Renewable Energy Resources in Pakistan
    Solangi, Yasir Ahmed
    Tan, Qingmei
    Mirjat, Nayyar Hussain
    Valasai, Gordhan Das
    Khan, Muhammad Waris Ali
    Ikram, Muhammad
    PROCESSES, 2019, 7 (02)
  • [40] Using integrated fuzzy DEMATEL and fuzzy C: means algorithm for supplier evaluation and selection
    Keskin, Gulsen Aydin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (12) : 3586 - 3602