A fuzzy integrated approach for project selection

被引:8
|
作者
Bolat, Bersam [1 ]
Cebi, Ferhan [1 ]
Temur, Gul Tekin [1 ]
Otay, Irem [1 ]
机构
[1] Istanbul Tech Univ, Management Engn, Istanbul, Turkey
关键词
Information systems; Project selection; Fuzzy analytical hierarchical process; Fuzzy multi-objective linear programming; Multi-criteria decision making;
D O I
10.1108/JEIM-12-2013-0091
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Purpose - The purpose of this paper is to develop a systematic and comprehensive project selection model utilizing fuzzy multi-objective linear programming (FMOLP) that deals with the imprecise data in IS projects and uncertain judgment of decision makers. Design/methodology/approach - First, projects are prioritized by considering both quantitative and qualitative factors. A fuzzy analytical hierarchical process (FAHP) is used in order to obtain weights of each project that indicates their priorities. At the second step, project selection decision is completed by using FMOLP. Then, the sensitivity analysis is performed to evaluate the robustness of the proposed integrated model. Findings - The result of this study indicates that an integrated approach utilizing FAHP and FMOLP can be used as a supportive tool for project selection in IS context. It decreases the uncertainty caused from uncertain judgment of decision makers. Research limitations/implications - Future studies are suggested to design models having fuzzy constraints such as budget and resources. Moreover, for future studies, non-linear membership functions can be used. Practical implications - Actual projects are provided from the Turkish IS company for prioritizing process and a hypothetical mathematical model is demonstrated using illustrative data. Originality/value - This study contributes to the relevant literature by proposing a comprehensive model considering many conflicting ideas of decision makers on quantitative and qualitative criteria, and evaluating projects in an integrated way including FAHP and FMOLP.
引用
收藏
页码:247 / +
页数:15
相关论文
共 50 条
  • [21] Construction Project Selection with the Use of Fuzzy Preference Relation
    Ibadov, Nabi
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2015 (ICNAAM-2015), 2016, 1738
  • [22] Integrated resource management for simultaneous project selection and scheduling
    Shariatmadari, Mohammad
    Nahavandi, Nasim
    Zegordi, Seyed Hessameddin
    Sobhiyah, Mohammad Hossein
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 109 : 39 - 47
  • [23] Project portfolio selection for construction contractors by MCDM-GIS approach
    Hashemizadeh, A.
    Ju, Y.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2019, 16 (12) : 8283 - 8296
  • [24] Fuzzy Multicriteria Decision Support for Information Systems Project Selection
    Yeh, Chung-Hsing
    Deng, Hepu
    Wibowo, Santoso
    Xu, Yan
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2010, 12 (02) : 170 - 179
  • [25] PROJECT PORTFOLIO SELECTION USING FUZZY AHP AND VIKOR TECHNIQUES
    Fouladgar, Mohammad Majid
    Yazdani-Chamzini, Abdolreza
    Zavadskas, Edmundas Kazimieras
    Yakhchali, Siamak Haji
    Ghasempourabadi, Mohammad Hossein
    TRANSFORMATIONS IN BUSINESS & ECONOMICS, 2012, 11 (01): : 213 - 231
  • [26] Lean Six Sigma project selection using hybrid approach based on fuzzy DEMATEL-ANP-TOPSIS
    Vinodh, S.
    Swarnakar, Vikas
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2015, 6 (04) : 313 - 338
  • [27] Normative Approach to Six Sigma Project Selection
    Al Kindi, Mahmood
    2011 IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON 2011), 2011, : 189 - 193
  • [28] Assessing the solar PV power project site selection in Pakistan: based on AHP-fuzzy VIKOR approach
    Solangi, Yasir Ahmed
    Shah, Syed Ahsan Ali
    Zameer, Hashim
    Ikram, Muhammad
    Saracoglu, Burak Omer
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2019, 26 (29) : 30286 - 30302
  • [29] A fuzzy number ranking in project selection for cultural heritage sites
    Sanna, Ulrico
    Atzeni, Cirillo
    Spanu, Nannina
    JOURNAL OF CULTURAL HERITAGE, 2008, 9 (03) : 311 - 316
  • [30] A fuzzy AHP-based methodology for project prioritization and selection
    Shaygan, Amir
    Testik, Ozlem Muge
    SOFT COMPUTING, 2019, 23 (04) : 1309 - 1319