USE OF RISK PREMIUMS IN CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING

被引:9
作者
ASKEW, AJ [1 ]
机构
[1] UNIV NEW S WALES,SCH CIVIL ENGN,KENSINGTON,NEW S WALES,AUSTRALIA
关键词
D O I
10.1029/WR011i006p00862
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:862 / 866
页数:5
相关论文
共 4 条
[1]   OPTIMUM RESERVOIR OPERATING POLICIES AND IMPOSITION OF A RELIABILITY CONSTRAINT [J].
ASKEW, AJ .
WATER RESOURCES RESEARCH, 1974, 10 (01) :51-56
[2]   CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING AND OPTIMIZATION OF WATER-RESOURCE SYSTEMS [J].
ASKEW, AJ .
WATER RESOURCES RESEARCH, 1974, 10 (06) :1099-1106
[3]  
BEARD LR, 1973, J HYDRAULICS DIV P A, V99, P559
[4]  
JAMES LD, 1971, ECONOMICS WATER RESO, P124