摘要
Utilizing the gathered failure data and failure interval data from Tabas coal mine in two years, this paper discusses the reliability of powered supports. The data sets were investigated using statistical procedures and in two levels: the existence of trend and serial correlation. The results show that the powered supports follow the Gamma reliability function. The reliability of the machine decreases to almost zero after 520 operation hours and after 80 hours the probability of failure of powered supports increases to 60 percent. The failure rate of powered support shows an improving behavior and therefore a decreasing failure rate. In the beginning of the process, the failure rate is 0.021 failures per hour. This reaches the rate of 0.012 after a sudden decrease, thence forward on a gently decreasing rate and after 100 hours gets to the rate of 0.01. Regarding the maintenance policy and to protect the machine's operation continuity, preventive maintenance strategy can be chosen. The reliability of the discussed machine can be maintained on a descent level by inspecting and controlling the parts in short term intervals. With regard to reliability plots of powered supports operation, preventive reliability-based maintenance time intervals for 80% reliability levels for powered supports is 15 hours.
引用
收藏
页码:113 / 120
页数:8
相关论文
共 22 条
  • [1] [Anonymous], 1986, MILSTD2173 DEPT DEF
  • [2] Ascher H, 1984, REPAIRABLE SYSTEMS R
  • [3] Ataei M., 2007, UNDERGROUND MINING
  • [4] GUPTA A, 2010, PROBABILITY STAT MOD
  • [5] Replacement and maintenance analysis of longwall shearer using fault tree technique
    Gupta, S.
    Ramkrishna, N.
    Bhattacharya, J.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2006, 115 (02): : 49 - 58
  • [6] Reliability analysis of a conveyor system using hybrid data
    Gupta, Suprakash
    Bhattacharya, Jayanta
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2007, 23 (07) : 867 - 882
  • [7] Hadi Hoseinie Seyed, 2011, Journal of Coal Science and Engineering, V17, P192, DOI 10.1007/s12404-011-0216-z
  • [8] Hao Bing-yuan, 2009, Journal of Coal Science and Engineering (China), V15, P76, DOI 10.1007/s12404-009-0115-8
  • [9] Hoseinie Seyed Hadi, 2011, Journal of Coal Science and Engineering, V17, P450, DOI 10.1007/s12404-011-0419-3
  • [10] Hoseinie Seyed Hadi, 2011, International Journal of Mining and Mineral Engineering, V3, P26, DOI 10.1504/IJMME.2011.041447