An integrated business improvement system (IBIS) for construction

被引:19
作者
Beatham, Simon [1 ]
Anumba, Chimay [1 ]
Thorpe, Tony [1 ]
Hedges, Ian [2 ]
机构
[1] Loughborough Univ Technol, Ctr Innovat Construct Engn, Dept Civil & Bldg Engn, Loughborough, Leics, England
[2] AMEC Grp Ltd, Ind & PharmaChem, Stratford Upon Avon, England
关键词
Performance measurement (quality); European Foundation for Quality Management; Balanced scorecard; Continuous improvement; Integration;
D O I
10.1108/13683040510602876
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose - To review the key facets of a performance measurement system (PMS) and report on the development of a new model based on the European Foundation of Quality Management (EFQM) excellence model. Design/methodology/approach - The research involved detailed literature reviews and action research within the case study organisation. It involved the design of an integrated business improvement system (IBIS) that enables proactive performance measurement within an organisation. Findings - Key performance indicators (KPIs) are now widely used in the construction industry but there is little evidence that they are being used as an integral and systematic part of an overall PMS. The approach proposed here and encapsulated in IBIS is intended to improve current practice. Practical implications - The research found that the active engagement of both senior management and potential end-users is vital for the successful design and implementation of a PMS. Originality/value - The novelty of the paper lies in the detailed description of the stages followed in the development of the IBIS, and the model itself. It will be of value to researchers and business improvement managers both within and outside the construction industry
引用
收藏
页码:42 / 55
页数:14
相关论文
共 37 条
[1]  
Beatham S, 2003, INNOVATIVE DEVELOPMENTS IN ARCHITECTURE, ENGINEERING AND CONTRUCTION, P749
[2]  
BEATHAM S, 2004, INT J BENCHMARKING, V11, P93
[3]  
Beatham S. M., 2002, ADV CONCURRENT ENG, P413
[4]   Integrated performance measurement systems: A development guide [J].
Bititci, US ;
Carrie, AS ;
McDevitt, L .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1997, 17 (5-6) :522-+
[5]   Designing, implementing and updating performance measurement systems [J].
Bourne, M ;
Mills, J ;
Wilcox, M ;
Neely, A ;
Platts, K .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2000, 20 (07) :754-771
[6]  
British Quality Foundation/Construction Productivity Network, 2001, 1149 BQFCPN
[7]  
CIRIA, 2001, IP44 CIRIA
[8]  
Crane A., 2002, PERFORMANCE MEASUREM
[9]   DESIGNING PERFORMANCE-MEASUREMENT SYSTEMS FOR JUST-IN-TIME OPERATIONS [J].
CRAWFORD, KM ;
COX, JF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) :2025-2036
[10]  
Dixon J. R., 1990, NEW PERFORMANCE CHAL