OPTIMAL DUE-DATE DETERMINATION AND SEQUENCING OF N-JOBS ON A SINGLE-MACHINE

被引:0
作者
CHENG, TCE
机构
关键词
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:433 / 437
页数:5
相关论文
共 21 条
[1]   FINDING AN OPTIMAL SEQUENCE BY DYNAMIC-PROGRAMMING - EXTENSION TO PRECEDENCE-RELATED TASKS [J].
BAKER, KR ;
SCHRAGE, LE .
OPERATIONS RESEARCH, 1978, 26 (01) :111-120
[2]  
BAKER KR, 1980, 198002 U TECHN IND E
[3]  
CHENG TCE, 1983, 7TH P INT C PROD RES
[4]  
CHENG TCE, 1983, P AIIE ANN C KENTUCK
[5]  
Conway R, 1967, THEORY SCHEDULING
[6]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[7]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[8]   ONE-MACHINE SEQUENCING TO MINIMIZE CERTAIN FUNCTIONS OF JOB TARDINESS [J].
EMMONS, H .
OPERATIONS RESEARCH, 1969, 17 (04) :701-&
[9]  
HODGSON IJ, 1977, MANAGE SCI, V23, P1144
[10]  
Jackson J.R., 1955, MANAGEMENT SCI RES P