共 50 条
- [41] OPTIMUM PREVENTIVE MAINTENANCE POLICIES FOR A 2-UNIT REDUNDANT SYSTEM WITH REPAIR AND POST-REPAIR MICROELECTRONICS AND RELIABILITY, 1980, 20 (06): : 887 - 890
- [42] AVAILABILITY AND RELIABILITY OF A 2-UNIT 2-SERVER SYSTEM SUBJECT TO PREVENTIVE MAINTENANCE AND REPAIR RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1978, 12 (01): : 85 - 92
- [44] ANALYSIS OF A 2-UNIT SYSTEM SUBJECT TO REPAIR AND PREVENTIVE MAINTENANCE WITH NON-LINEAR REVENUE AND COSTS MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 621 - 623
- [45] PROFIT ANALYSIS OF 2-UNIT STANDBY SYSTEM WITH REST PERIOD FOR THE OPERATOR AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 753 - 757
- [46] PREVENTIVE MAINTENANCE OF A 1-UNIT SYSTEM WITH 2 TYPES OF REPAIR MICROELECTRONICS AND RELIABILITY, 1982, 22 (02): : 287 - 293
- [47] STOCHASTIC BEHAVIOR OF A 2-UNIT PRIORITY STANDBY REDUNDANT SYSTEM WITH REPAIR MICROELECTRONICS AND RELIABILITY, 1975, 14 (03): : 309 - 313
- [49] RELIABILITY-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH A REPLACEABLE REPAIR FACILITY MICROELECTRONICS AND RELIABILITY, 1989, 29 (02): : 145 - 150