共 50 条
[31]
Capacitor switching control using a decision table for a 115-kV power transmission system in Thailand
[J].
KNOWLEDGE-BASED INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, PT 1, PROCEEDINGS,
2004, 3213
:1262-1268
[32]
Case Study of the Lightning Performance of a 230 kV Transmission Line
[J].
2018 IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D),
2018,
[34]
New Approach for Upgrading an Existing 115 kV Transmission Line
[J].
ELECTRICAL TRANSMISSION AND SUBSTATION STRUCTURES 2015: TECHNICAL CHALLENGES AND INNOVATIVE SOLUTIONS IN GRID MODERNIZATION,
2015,
:538-549
[35]
230 KV OPERATION OF A SUBSTATION DESIGNED FOR 115 KV BY CONTROLLING VOLTAGE TRANSIENTS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1984, 103 (09)
:2685-2690
[36]
Identify Direct Lightning Strike Location Based on Discrete Wavelet Transform for 115-kV Transmission System
[J].
IEEE ACCESS,
2022, 10
:80609-80622
[38]
JAMUNA RIVER 230 KV CROSSING - BANGLADESH .2. DESIGN OF TRANSMISSION-LINE
[J].
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION,
1984, 76 (NOV)
:951-964
[39]
FIELD TESTS AND DESIGN EVALUATION OF A 230-KV 20 000-MVA OIL CIRCUIT BREAKER
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1967, PA86 (01)
:117-&
[40]
CABLE SWITCHING TESTS ON A 230-KV SF6 CIRCUIT BREAKER
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1965, PA84 (01)
:48-+