Cost forecasting using RCF: a case study for planning public building projects costs in Turkey

被引:8
作者
Bayram, Savas [1 ,2 ]
Al-Jibouri, Saad [2 ]
机构
[1] Erciyes Univ, Dept Civil Engn, Kayseri, Turkey
[2] Univ Twente, Dept Construct Management & Engn, Enschede, Netherlands
关键词
Cost forecasting; optimism bias; reference class forecasting; unit area cost; unit price analysis;
D O I
10.1080/15623599.2017.1333399
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Many construction projects are perceived to perform badly since the majority of them suffer cost overruns. This paper analyses cost estimates produced by two most commonly used estimation methods for building projects in Turkey, namely unit area cost (UAC) and unit price analysis (UPA). It also investigates whether reference class forecasting (RCF) method can be used to provide the client with more certainty in the final project cost forecasts compared to those two methods. Data from 369 public building projects in Turkey were collected and cost overruns were analysed. Part of the data representing 14% of the projects were randomly selected and used as control group for testing the reliability of the forecasts produced using RCF. The results have shown the estimates of the final project cost produced using the UAC and UPA methods in Turkey are either too pessimistic or optimistic. The results have also shown that it is possible to use the reference class as a basis to produce a reasonably accurate prediction of the actual cost of a project in a similar class for various levels of acceptable risks. This is achieved by adding uplifts/reductions to the estimates produced by the two traditional methods.
引用
收藏
页码:405 / 417
页数:13
相关论文
共 34 条
[1]  
[Anonymous], 2003, GREEN BOOK APPR EV C
[2]  
Arafa M., 2011, J ARTIF INTELL, V4, P63, DOI [10.3923/jai.2011.63.75, DOI 10.3923/JAI.2011.63.75]
[3]   Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques [J].
Awojobi, Omotola ;
Jenkins, Glenn P. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2016, 63 :19-32
[4]   INTEGRATED WEB-BASED DATA WAREHOUSE AND ARTIFICIAL NEURAL NETWORKS SYSTEM FOR UNIT PRICE ANALYSIS WITH INFLATION ADJUSTMENT [J].
Baalousha, Yousef ;
Celik, Tahir .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2011, 17 (02) :157-167
[5]  
Baykan UN, 2007, THESIS
[6]  
Bayram S, 2012, INT STUD C CIV ENG I
[7]  
Bayram S., 2013, THESIS
[8]  
Bostancioglu E., 2006, DOKUZ EYLUL U FACULT, V8, P27
[9]  
Civelekoglu G., 2006, THESIS
[10]   THE EFFECT OF CURRENT PUBLIC PROCUREMENT LAW ON DURATION AND COST OF CONSTRUCTION PROJECTS IN TURKEY [J].
Erdis, Ercan .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 (01) :121-135