RISK ASSESSMENT OF TUNNEL PORTALS IN THE CONSTRUCTION STAGE BASED ON FUZZY ANALYTIC HIERARCHY PROCESS

被引:9
作者
Deng, Xianghui [1 ]
Wang, Rui [1 ]
Xu, Tian [1 ]
机构
[1] Xian Technol Univ, Sch Civil & Architecture Engn, Xian, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
tunnel portal; construction stage; FAHP; risk assessment;
D O I
10.2478/ace-2018-0045
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study presents a fuzzy analytic hierarchy process (FAHP) by integrating analytic hierarchy process (AHP) and fuzzy cognition to evaluate the construction risks of tunnel portals. Wuguanyi Tunnel is taken as the research objective to validate the performance of the proposed method. The result shows that the proposed decision making method can effectively identify risk factors and determine the risk level during the construction of tunnel portals. Finally, the corresponding control measures during the construction of the Wuguanyi Tunnel portal are proposed according to the risk assessment results.
引用
收藏
页码:69 / 87
页数:19
相关论文
共 21 条
[1]  
Al-Subhi Al-Harbi K. M., 2001, International Journal of Project Management, V19, P19, DOI 10.1016/S0263-7863(99)00038-1
[2]   The revised method of ranking LR fuzzy number based on deviation degree [J].
Asady, B. .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (07) :5056-5060
[3]   A new practical approach to risk management for underground mining project in Quebec [J].
Badri, Adel ;
Nadeau, Sylvie ;
Gbodossou, Andre .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2013, 26 (06) :1145-1158
[4]   Applications of the extent analysis method on fuzzy AHP [J].
Chang, DY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (03) :649-655
[5]   The role of occupational safety measures on reducing accidents in marble quarries of Iscehisar region [J].
Ersoy, Metin .
SAFETY SCIENCE, 2013, 57 :293-302
[6]  
Hamidreza Nezarat, 2015, TUNN UNDERGR SP TECH, V50, P358
[7]   Fuzzy FMEA with a guided rules reduction system for prioritization of failures [J].
Kai Meng Tay ;
Lim, Chee .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2006, 23 (08) :1047-+
[8]  
Lakoff G., 1977, J PHILOS LOGIC, V2, P234
[9]  
Li, 2008, THESIS
[10]   Improved AHP Method and Its Application in Risk Identification [J].
Li, Fengwei ;
Phoon, Kok Kwang ;
Du, Xiuli ;
Zhang, Mingju .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (03) :312-320