共 37 条
[1]
Ammons J.C., Lofgren C.B., McGinnis L.F., A large scale machine loading problem in flexible assembly, Annals of Operations Research, 3, pp. 319-332, (1985)
[2]
Anderson T.W., An Introduction to Multivariate Statistical Analysis, (1985)
[3]
Baker K.N., Bertrand J., A comparison of due date selection rules, IIE Transactions, 13, pp. 123-131, (1981)
[4]
Baker K.N., Kanet J.J., Job shop scheduling with modified due dates, Journal of Operations Management, 4, pp. 11-22, (1983)
[5]
Barcikowski R.S., Computer Packages and Research Design, 2, (1983)
[6]
Berenson M.L., Levine D.M., Goldstein M., Intermediate Statistical Methods and Applications, (1983)
[7]
Bobrowski P.M., An Investigation of Alternate Routing in the Job Shop as a Planning Process, (1985)
[8]
Chen S.-K., The Design, Evaluation and Test of Flexible Manufacturing System: A Hybrid Approach of Optimization and Physical Emulation, (1987)
[9]
Cheng T.C., Gupta M.C., Survey of scheduling research involving due date determination decisions, Europen Journal of Operational Research, 38, pp. 156-166, (1989)
[10]
Co H.C., Jaw T.C., Chen S.K., Sequencing in flexible manufacturing systems and other short queue-length systems, Journal of Manufacturing Systems, 7, pp. 1-8, (1981)