共 50 条
- [42] DEVELOPMENT OF STORM DRAINAGE COST FUNCTIONS JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1976, 102 (04): : 515 - 526
- [43] DEVELOPMENT OF STORM DRAINAGE COST FUNCTIONS JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1977, 103 (03): : 329 - 331
- [44] Several key technical issues in foundation grouting and drainage design for Gezhouba project Renmin Changjiang/Yangtze River, 2002, 33 (02):
- [46] Technical criteria for the precast segments design in the new lines of the Madrid subway TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 369 - 374
- [48] Technical, financial and location criteria for the design of land application system treatment Environmental Earth Sciences, 2014, 71 : 13 - 21