共 156 条
- [62] Forrester JW., 1961, IND DYNAMICS
- [65] FEASIBILITY OF SCHEDULING LOT SIZES OF 3 PRODUCTS ON ONE MACHINE [J]. MANAGEMENT SCIENCE, 1992, 38 (10) : 1482 - 1494
- [66] GLASS CA, 1992, EUROPEAN J OPERATION, V75, P378
- [67] GLASS CA, 1994, EUROPEAN J OPERATION
- [70] THE MULTI-PRODUCT PRODUCTION CYCLING PROBLEM [J]. AIIE TRANSACTIONS, 1980, 12 (03): : 233 - 240