Identifying design development factors in Australian PPP projects using an AHP framework

被引:20
作者
Raisbeck, Peter [1 ]
Tang, Llewellyn C. M. [2 ]
机构
[1] Univ Melbourne, Dept Architecture Bldg & Planning, Melbourne, Vic 3010, Australia
[2] Univ Reading, Sch Construct Management & Engn, Reading, Berks, England
关键词
Analytic hierarchy process; design; design management; public-private partnerships;
D O I
10.1080/01446193.2012.729133
中图分类号
F [经济];
学科分类号
02 ;
摘要
In Australia consortiums will come together and create an initial design concept or sketch design at the public-private partnership (PPP) bid stage. If the bid is successful this initial design is then developed further. However, a winning bid may have been evaluated on financial criteria alone and the consortium's capability to develop the design through to project delivery may not have been thoroughly evaluated. In theory, design is a key process in PPP projects and the aim of the research was to understand what capabilities are important in the development of a design through this process. To clarify these issues, a range of activities and organizational factors linked to design development are proposed using the analytic hierarchy process (AHP) method. This method was chosen in order to see which design development factors were ranked more highly by experts. In this research the hierarchy was designed employing the categories of exploratory and exploitative design development. Below each of these overarching categories, there were four design development functional distinctions: the two exploratory distinctions were Design (D) and Design Management (DM). The two exploitative distinctions were Design Support (DS) and Design Infrastructure (DI). A further list of 36 design development sub-criteria was developed under the above categories. These sub-criteria formed the basis of a survey of respondents drawn from a database of industry sources in the public domain as well as a list gathered from a large developer involved in PPP projects. It included relatively senior managers, PPP project managers and architects. Survey respondents identified a recent PPP project that they had worked on. From the 36 responses it can be seen that the exploratory Design (D) and Design Management (DM) activities were ranked more highly than the exploitative activities of Design Support (DS) and Design Infrastructure (DI) associated with a PPP project organization. This suggests that PPP frameworks should account for these exploratory factors as well as the exploitative factors associated with compliance, quality systems and project team infrastructure. This indicates that in PPP projects design development through the effective management of an initial design is a critical factor.
引用
收藏
页码:20 / 39
页数:20
相关论文
共 22 条
  • [1] Assessment of critical success factors for PPP airports using the AHP
    Chourasia, Avin Shekhar
    Dalei, Narendra N.
    Jha, Karunakar
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2024, 20 (03) : 241 - 260
  • [2] IDENTIFYING THE INFLUENCES ON PERFORMANCE OF ENGINEERING DESIGN AND DEVELOPMENT PROJECTS
    Snider, Chris
    Emanuel, Lia
    Gopsill, James
    Joel-Edgar, Sian
    Hicks, Ben
    DS87-2 PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN (ICED 17), VOL 2: DESIGN PROCESSES, DESIGN ORGANISATION AND MANAGEMENT, 2017, : 299 - 308
  • [3] Identifying Critical Influencing Factors of the Value Creation of Urban Rail Transit PPP Projects in China
    Li, Xuewei
    Yuan, Jingfeng
    Liu, Xuan
    Ke, Yongjian
    Jia, Sijia
    BUILDINGS, 2022, 12 (08)
  • [4] Social Risk Factors of Transportation PPP Projects in China: A Sustainable Development Perspective
    Yuan, Jingfeng
    Li, Wei
    Guo, Jiyue
    Zhao, Xianbo
    Skibniewski, Miroslaw J.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2018, 15 (07)
  • [5] Identifying and Prioritization Effective Factors in TQM implementation Using AHP and DEMATEL Methods
    Mavi, Reza Kiani
    Madanshekaf, Shahram
    Hafshejani, Kiamars Fathi
    Gharakhani, Davood
    LIFE SCIENCE JOURNAL-ACTA ZHENGZHOU UNIVERSITY OVERSEAS EDITION, 2012, 9 (04): : 2586 - 2592
  • [6] Identifying the Critical Factors Affecting the Operational Performance of Characteristic Healthcare Town PPP Projects: Evidence from China
    Pan, Haize
    Pan, Yongwei
    Liu, Xing
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2023, 29 (04)
  • [7] Identifying critical risks in Sponge City PPP projects using DEMATEL method: A case study of China
    Zhang, Lin
    Sun, Xuejie
    Xue, Hong
    JOURNAL OF CLEANER PRODUCTION, 2019, 226 : 949 - 958
  • [8] Evaluation of risk factors in Ghanaian public-private-partnership (PPP) power projects using fuzzy synthetic evaluation methodology (FSEM)
    Kukah, Augustine Senanu Komla
    Owusu-Manu, De-Graft
    Badu, Edward
    Edwards, David John
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2023, 30 (08) : 2554 - 2582
  • [9] A Framework for Identifying and Validating Idea Screening Criteria-A Case of Research and Development Projects in the Computing and Automation Industry
    Seboni, Lone
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 182 - 191
  • [10] Analysing dimensions and indicators to design energy education framework in Malaysia using the analytic hierarchy process (AHP)
    Ilham, Zul
    Subramaniam, Indrani
    Jamaludin, Adi Ainurzaman
    Wan-Mohtar, Wan Abd Al Qadr Imad
    Halim-Lim, Sarina Abdul
    Ohgaki, Hideaki
    Ishihara, Keiichi
    Abu Mansor, Mohd Radzi
    ENERGY REPORTS, 2022, 8 : 1013 - 1024