MEASUREMENT OF BRICKWORK AND BLOCKWORK PRODUCTIVITY .1. PRODUCTIVITY OF OPERATIONS CAN BE IMPROVED BY ACCURATE ESTIMATING, GOOD PLANNING, OPTIMUM USE OF RESOURCES AND HAVING A SOUND KNOWLEDGE OF THE PRODUCTIVITY VARIABLES

被引:0
作者
JAYAWARDANE, AKW
PRICE, ADF
HARRIS, FC
机构
[1] LOUGHBOROUGH UNIV TECHNOL,DEPT CIVIL & BLDG ENGN,LOUGHBOROUGH,LEICS,ENGLAND
[2] WOLVERHAMPTON UNIV,WOLVERHAMPTON,ENGLAND
关键词
BRICKWORK AND BLOCKWORK PRODUCTIVITY; ACTIVITY SAMPLING; BASIC AND STANDARD TIMES; UK;
D O I
10.1080/09613219508727433
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In part A the authors describe the field data collection performed using Activity Sampling and explain the principles of calculation, basic times, standard times, placing times, operative factors, gang factors, site factors and balancing of gang sizes. The research demonstrates that it is possible to obtain basic and standard times for fairly complex operations and present these in the form of standard equations.
引用
收藏
页码:81 / 86
页数:6
相关论文
共 18 条
[1]  
BROOMFIELD JR, 1984, P I CIVIL ENG, V2, P379
[2]  
FORBES WS, 1968, OUTPUT BRICKLAYERS
[3]  
GILBRETH FB, BRICKLAYING SYSTEMS
[4]  
Harris F., 1994, MODERN CONSTRUCTION
[5]  
MORTLOCK DJ, BUILDING SCI, V4, P179
[6]  
PRICE AD, 1985, METHODS MEASURING PR
[7]   CALCULATING RELAXATION ALLOWANCES FOR CONSTRUCTION OPERATIVES .1. METABOLIC COST [J].
PRICE, ADF .
APPLIED ERGONOMICS, 1990, 21 (04) :311-317
[8]   CALCULATING RELAXATION ALLOWANCES FOR CONSTRUCTION OPERATIVES .2. LOCAL MUSCLE FATIGUE [J].
PRICE, ADF .
APPLIED ERGONOMICS, 1990, 21 (04) :318-324
[9]   IMPROVING PRODUCTIVITY ESTIMATES BY WORK SAMPLING [J].
THOMAS, HR ;
GUEVARA, JM ;
GUSTENHOVEN, CT .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (02) :178-188
[10]  
THOMAS RH, 1983, CREW PERFORMANCE MEA, P309