共 36 条
- [1] Multi-criteria assessment of new and renewable energy power plants [J]. ENERGY, 2002, 27 (08) : 739 - 755
- [2] Akhavi F, 2003, IEEE SYS MAN CYBERN, P956
- [3] ALPERT SB, 1991, ANNU REV ENERG ENV, V16, P1
- [4] [Anonymous], 1994, IND TECHNOLOGY ENV C, P345
- [5] [Anonymous], 1994, STUDIES ENV COSTS EL, P13
- [6] Bao Y, 2004, 5 WORLD C INT CONTR, P177
- [7] Boucher T. O., 1997, Engineering Economist, V42, P179, DOI 10.1080/00137919708903178
- [8] Clarke RR, 1997, EN CONV ENG C IECEC, P2197
- [9] Columbia River Gorge Technical Team and Interagency Coordination Team, 2003, TECHN STUD, P1
- [10] Coon C., 2008, WINDPOWER BENEVOLENT