In Situ Load Testing of Parking Garage Reinforced Concrete Slabs: Comparison between 24 h and Cyclic Load Testing

被引:22
|
作者
Casadei, Paolo [1 ]
Parretti, Renato [2 ]
Nanni, Antonio [3 ]
Heinze, Tom [4 ]
机构
[1] Univ Missouri, Civil Engn, Engn Res Lab 220, Rolla, MO 65409 USA
[2] Co Force America Inc, Rolla, MO 65401 USA
[3] Univ Missouri, Dept Civil Engn, Engn Res Lab 224, Rolla, MO 65409 USA
[4] Div Design & Construct, Clayton, MO 63105 USA
基金
美国国家科学基金会;
关键词
Assessment; Concrete; Cyclic loads; In situ tests; Load tests; Parking facilities; Reinforced; Slabs;
D O I
10.1061/(ASCE)1084-0680(2005)10:1(40)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper reports on the results obtained on the applicability of the diagnostic cyclic load test method in comparison with the existing 24 h test procedure adopted in ACI-318. A parking garage, owned by St. Louis County, St. Louis, Missouri, scheduled for demolition during the summer of 2002 was used as a research test bed before demolition. This structure, a two-story steel and reinforced concrete (RC) frame with one-way RC slabs built in 1970's, was ideal, in terms of size and construction system, for performing comparative field experimentation on load testing. Investigation and validity of acceptance criteria of existing and proposed testing methods were performed. Two identical RC slabs were tested, according to both the standard procedure (ACI-318-02) and the proposed diagnostic load testing. In both instances, the applied total test load was such that the slab did not pass the load test. This allowed characterizing the critical test parameters that govern acceptability and draw conclusions on their values. After load testing, both slabs were loaded until partial collapse was reached. This allowed making observations on the margin of safety with respect to collapse, a determination that is not generally possible in a proof test. The analysis of the experimental data provides professionals with evidence on the validity of in situ assessment for the adequacy of structural members.
引用
收藏
页码:40 / 48
页数:9
相关论文
共 5 条
  • [1] Proof load testing of reinforced concrete slab bridges in the Netherlands
    Lantsoght, Eva
    van der Veen, Cor
    de Boer, Ane
    Hordijk, Dick A.
    STRUCTURAL CONCRETE, 2017, 18 (04) : 597 - 606
  • [2] Development of recommendations for proof load testing of reinforced concrete slab bridges
    Lantsoght, Eva O. L.
    van der Veen, Cor
    Hordijk, Dick A.
    de Boer, Ane
    ENGINEERING STRUCTURES, 2017, 152 : 202 - 210
  • [3] Stop Criteria for Flexure for Proof Load Testing of Reinforced Concrete Structures
    Lantsoght, Eva O. L.
    Yang, Yuguang
    van der Veen, Cor
    Hordijk, Dick A.
    de Boer, Ane
    FRONTIERS IN BUILT ENVIRONMENT, 2019, 5
  • [4] Structural Qualification of a Developed GFRP-Reinforced Concrete Bridge Barrier using Ultimate Load Testing
    Sennah, Khaled
    Tropynina, Ekaterina
    Ibrahim, Zaki
    Hedjazi, Saman
    INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2018, 12 (01)
  • [5] The Field Testing of High Performance Fiber Reinforced Concrete Slabs under the TNT Load Explosion together with the Analytical Solution and the Numerical Modelling of those Tests Results.
    Stoller, Jiri
    Zezulova, Eva
    INTERNATIONAL CONFERENCE ON MILITARY TECHNOLOGIES (ICMT 2015), 2015, : 211 - 218