AN EXPERIMENTAL INVESTIGATION OF SCHEDULING NONIDENTICAL, PARALLEL PROCESSORS WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DUE-DATES

被引:7
|
作者
RANDHAWA, SU
SMITH, TA
机构
[1] Department of Industrial and Manufacturing Engineering, Oregon State University, Corvallis, OR
[2] Automated Systems Inc, Brookfield, WI, 53045
关键词
D O I
10.1080/00207549508930137
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An experimental investigation of factors affecting the scheduling of a system of nonidentical, parallel processors using a series of experimental designs was carried out. System variables included were processor capacity relationships, sequencing and assignment rules, job size, and product demand distributions. The effect of the variables was measured by comparing mean flow times, proportion of jobs tardy, and processor utilization spread. Results showed that system loading and set-up times play a major role in system performance. Grouping jobs by product will minimize set-up times and hence mean flow time and tardiness at the expense of controlling individual processor usage. Factors involving processor capacities and assignment rules tend to have no effect on any of the system performance measures. Variability in job size and product demand tended to give flexibility in controlling individual processor utilization.
引用
收藏
页码:59 / 69
页数:11
相关论文
共 50 条
  • [41] Scheduling jobs on parallel machines with sequence-dependent setup times
    Lee, YH
    Pinedo, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) : 464 - 474
  • [42] SEQUENCE DEPENDENT SET-UP TIMES AND JOB SEQUENCING
    WHITE, CH
    WILSON, RC
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (02) : 191 - 202
  • [43] WARNING ABOUT CYCLIC LOT SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIMES.
    Carter, Michael W.
    Magazine, Michael J.
    Moon, Tae-Shik
    International Journal of Production Research, 1988, 26 (07): : 1281 - 1283
  • [44] A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times
    de Paula, Mateus Rocha
    Mateus, Geraldo Robson
    Ravetti, Martin Gomez
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) : 938 - 949
  • [45] Using two metaheuristic algorithms for scheduling parallel machines with sequence dependent set-up times in job shop industries
    Mohammadi, Ghorbanali
    Moaddabi, Erfan
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2021, 52 (14) : 2904 - 2917
  • [46] Improving the migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent set-up times
    Benkalai, Imene
    Rebaine, Djamal
    Gagne, Caroline
    Baptiste, Pierre
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) : 6145 - 6157
  • [47] Increasing production rate in U-type assembly lines with sequence-dependent set-up times
    Sahin, Murat
    Kellegoz, Talip
    ENGINEERING OPTIMIZATION, 2017, 49 (08) : 1401 - 1419
  • [48] A cooperative grey wolf optimizer for the joint flowshop scheduling problem with sequence-dependent set-up time
    Chen, Shuilin
    Zheng, Jianguo
    Zhang, Wenqiu
    ENGINEERING OPTIMIZATION, 2025, 57 (03) : 739 - 761
  • [49] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Zne-Jung Lee
    Shih-Wei Lin
    Kuo-Ching Ying
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
  • [50] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Lee, Zne-Jung
    Lin, Shih-Wei
    Ying, Kuo-Ching
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781