AN EXPERIMENTAL INVESTIGATION OF SCHEDULING NONIDENTICAL, PARALLEL PROCESSORS WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DUE-DATES

被引:7
|
作者
RANDHAWA, SU
SMITH, TA
机构
[1] Department of Industrial and Manufacturing Engineering, Oregon State University, Corvallis, OR
[2] Automated Systems Inc, Brookfield, WI, 53045
关键词
D O I
10.1080/00207549508930137
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An experimental investigation of factors affecting the scheduling of a system of nonidentical, parallel processors using a series of experimental designs was carried out. System variables included were processor capacity relationships, sequencing and assignment rules, job size, and product demand distributions. The effect of the variables was measured by comparing mean flow times, proportion of jobs tardy, and processor utilization spread. Results showed that system loading and set-up times play a major role in system performance. Grouping jobs by product will minimize set-up times and hence mean flow time and tardiness at the expense of controlling individual processor usage. Factors involving processor capacities and assignment rules tend to have no effect on any of the system performance measures. Variability in job size and product demand tended to give flexibility in controlling individual processor utilization.
引用
收藏
页码:59 / 69
页数:11
相关论文
共 50 条
  • [31] Rolling-horizon lot-sizing when set-up times are sequence-dependent
    Clark, AR
    Clark, SJ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (10) : 2287 - 2307
  • [32] Order release in a workload controlled flow-shop with sequence-dependent set-up times
    Fernandes, Nuno O.
    Carmo-Silva, S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (08) : 2443 - 2454
  • [33] Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach
    Mac Cawley, Alejandro
    Maturana, Sergio
    Pascual, Rodrigo
    Tortorella, Guilherme Luz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 819 - 839
  • [34] Controlled order release: a performance assessment in job shops with sequence-dependent set-up times
    Thuerer, Matthias
    Silva, Cristovao
    Stevenson, Mark
    Land, Martin
    PRODUCTION PLANNING & CONTROL, 2014, 25 (07) : 603 - 615
  • [35] Variable neighborhood search with memory for a single-machine scheduling problem with periodic maintenance and sequence-dependent set-up times
    Pacheco, Joaquin
    Porras, Santiago
    Casado, Silvia
    Baruque, Bruno
    KNOWLEDGE-BASED SYSTEMS, 2018, 145 : 236 - 249
  • [36] Dynamic adjustment of dispatching rule parameters in flow shops with sequence-dependent set-up times
    Heger, Jens
    Branke, Jurgen
    Hildebrandt, Torsten
    Scholz-Reiter, Bernd
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (22) : 6812 - 6824
  • [37] Stochastic sequencing with job families, set-up times, and due dates
    Van Oyen, MP
    Duenyas, I
    Tsai, CY
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1999, 30 (02) : 175 - 181
  • [38] Scheduling unrelated parallel machines with sequence-dependent setup times
    Zeidi, Javad Rezaeian
    MohammadHosseini, Samir
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496
  • [39] Scheduling unrelated parallel machines with sequence-dependent setup times
    Javad Rezaeian Zeidi
    Samir MohammadHosseini
    The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
  • [40] Parallel Machines Scheduling with Sequence-Dependent Setup Times Constraints
    Hu, Dayong
    Yao, Zhenqiang
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2528 - 2531