We wish to thank Mr M. Palmer for his help with the instrumentation and Dr W. Towlson;
Mr F. Want and Mr R. Catch for the preparation of the balloon platform. We are also grateful for valuable discussions with Dr P. Roberts and Dr T. Rengarajan and for the services provided by the NSBF who were responsible for the launch and recovery of the payload;