Geotechnical Risk Assessment of Mine Development Intersections with Respect to Mining Sequence

被引:7
作者
Abdellah, Wael [1 ]
Mitri, Hani [1 ]
Thibodeau, Denis [2 ]
Moreau-Verlaan, Lindsay [2 ]
机构
[1] McGill Univ, Fac Engn, Dept Min & Mat Engn, Montreal H3A 0E8, PQ, Canada
[2] Vale Ltd, Sudbury P0M 1N0, ON, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Sub-level stoping mining; Pointestimate method (PEM); Cost of consequences; Case study and risk-indexing tool;
D O I
10.1007/s10706-014-9742-y
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Mine developments such as haulage drifts and their intersections with cross-cuts are the only stope access in sub-level stoping mining system. Thus, they must remain stable during their service life. Haulage drift instability could lead to serious consequences such as: production delay, damage to equipment, loss of reserves and high operational cost. The goal of this paper is the stability of mine developments with respect to mining sequence with focus on the performance of haulage drift intersection during the production plan. A case study, the # 1 Shear East orebody at Vale's Garson Mine in Sudbury Ontario will be examined in this paper. A three-dimensional, elastoplastic, finite difference code (FLAC3D) is used for this study. The extent of strength-to-stress ratio corresponds to Mohr-Coulomb strength-to-stress ratio of 1.4 is used as failure evaluation criterion. The unsatisfactory performance is reached when the extent of strength-to-stress ratio exceeds the anchorage limit of the rockbolt. Stochastic analysis; adopting pointestimate method, is then employed with the numerical modelling to tackle the inherent uncertainty associated with rockmass properties. Then, the probability of instability at various mining steps is estimated for the roof and north wall of the studied intersection. The cost of consequence models is introduced to provide an economical solution if the intersection failed, blocked or damaged. Furthermore, the geotechnical risk associated with the instability of mine development intersection is estimated using risk-indexing tool. The results are presented and categorized in terms of probability, cost of consequence and riskindex at various mining stages.
引用
收藏
页码:657 / 671
页数:15
相关论文
共 20 条
[1]  
Abdellah Wael, 2012, International Journal of Mining and Mineral Engineering, V4, P63, DOI 10.1504/IJMME.2012.048000
[2]  
Abdellah W, 2013, INT J ROCK MECH MIN
[3]  
Bawden WF, 2002, 1 DEEP HIGH STRESS M
[4]  
Charette F, 2012, P 21 CAN ROCK MECH S
[5]   Point-estimate method as numerical quadrature [J].
Christian, JT ;
Baecher, GB .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1999, 125 (09) :779-786
[6]  
Golder Associate and MIRARCO, 2008, REP GARS MI IN PRESS
[7]  
HOEK E, 1980, J GEOTECH ENG-ASCE, V106, P1013
[8]  
ITASCA, 2009, FAST LAGR AN CONT 3
[9]  
Kaiser P.K., 2009, P 3 CANUS ROCK MECH
[10]  
Maloney S, 2006, 06015 MIRARCO GEOM R