Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

被引:6
作者
Alhamad, Khaled [1 ]
Alardhi, Mohsen [2 ]
Almazrouee, Abdulla [3 ]
机构
[1] PAAET, Coll Technol Studies, Technol Sci Dept, Shuwaikh 70654, Kuwait
[2] PAAET, Coll Technol Studies, Automot & Marine Engn Technol Dept, Shuwaikh 70654, Kuwait
[3] PAAET, Coll Technol Studies, Mfg Engn Technol Dept, Shuwaikh 70654, Kuwait
关键词
D O I
10.1155/2015/282178
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.
引用
收藏
页数:12
相关论文
共 42 条
[11]   On the impact of optimisation models in maintenance decision making: the state of the art [J].
Dekker, R ;
Scarf, PA .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1998, 60 (02) :111-119
[12]   Applications of maintenance optimization models: A review and analysis [J].
Dekker, R .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 51 (03) :229-240
[13]   INTEGRATING OPTIMIZATION, PRIORITY SETTING, PLANNING AND COMBINING OF MAINTENANCE ACTIVITIES [J].
DEKKER, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 82 (02) :225-240
[14]   OPTIMAL GENERATOR MAINTENANCE SCHEDULING USING INTEGER PROGRAMMING [J].
DOPAZO, JF ;
MERRILL, HM .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, 94 (05) :1537-1545
[15]   NEW MAINTENANCE-SCHEDULING METHOD WITH PRODUCTION COST MINIMIZATION VIA INTEGER LINEAR-PROGRAMMING [J].
EDWIN, KW ;
CURTIUS, F .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1990, 12 (03) :165-170
[16]   A Tabu search algorithm for maintenance scheduling of generating units [J].
El-Amin, I ;
Duffuaa, S ;
Abbas, M .
ELECTRIC POWER SYSTEMS RESEARCH, 2000, 54 (02) :91-99
[17]  
El-Sharkh M.Y., 1998, P MAINT REL C KNOXV
[18]   ECONOMIC SCHEDULING OF THE UAN COGENERATION PLANT - A PRELIMINARY OPTIMIZATION STUDY [J].
ELNASHAR, AM ;
KHAN, MS .
DESALINATION, 1991, 85 (01) :93-127
[19]  
Gen M., 1997, GENETIC ALGORITHMS E
[20]   A note: Common due date assignment for a single machine scheduling with the rate-modifying activity [J].
Gordon, Valery S. ;
Tarasevich, Alexander A. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (02) :325-328