A computer-based cost prediction model for institutional building projects in Nigeria An artificial neural network approach

被引:32
作者
Bala, Kabir [1 ]
Bustani, Shehu Ahmad [1 ]
Waziri, Baba Shehu [2 ]
机构
[1] Ahmadu Bello Univ, Dept Bldg, Fac Environm Design, Zaria, Nigeria
[2] Univ Maiduguri, Dept Civil & Water Resources Engn, Maiduguri, Nigeria
关键词
Neural network; Nigeria; Cost prediction; Institutional buildings;
D O I
10.1108/JEDT-06-2012-0026
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this study was develop a computer-based cost prediction model for institutional building projects in Nigeria through the use of artificial neural network (ANN) technique. The back-propagation network learns by example and provides good prediction to novel cases. Design/methodology/approach - The input variables were derived from related works with modification and advices from professionals through a field survey. Two hundred and sixty completed project data were used for training and development of the ANN model. Back-propagation algorithm using the gradient descent delta learning rule with a learning coefficient of 0.4 was used. The input layer of the model comprised of nine variables; building height, compactness of building, construction duration, external wall area, gross floor area, number of floors, proportion of opening on external walls, location index and time index. Findings - Several multi-layer perceptron networks were developed with varying architecture from which the network 9-7-5-1 was selected. The performance of the model over the validation sample revealed that the model has a mean absolute per cent error of 5.4 per cent and average error of prediction of -2.5 per cent over the sample. The ANN model was considered to be effective for construction cost prediction. Research limitations/implications - The model may not be suitable for other building types because of the uniqueness of such facility even though significant difference is not anticipated for buildings such as commercial and residential. The models were evaluated based on the prediction errors; other means of evaluation were not used. Originality/value - The study thus provides a simple, yet effective means of predicting construction costs of institutional building projects in Nigeria using an ANN model.
引用
收藏
页码:518 / 529
页数:12
相关论文
共 29 条
  • [1] Regularization neural network for construction cost estimation
    Adeli, H
    Wu, MY
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (01) : 18 - 24
  • [2] Akintoye A., 2000, CONSTRUCTION MANAGEM, V18, P77, DOI DOI 10.1080/014461900370979
  • [3] [Anonymous], 2005, INTRO NEURAL NETWORK
  • [4] Arafa M., 2011, J ARTIF INTELL, V4, P63, DOI [10.3923/jai.2011.63.75, DOI 10.3923/JAI.2011.63.75]
  • [5] Ashworth A., 1982, 27 CHART I BUILD
  • [6] Bhokha S., 1999, 7 E AS PAC C STRUCT
  • [7] Cheng M.Y., 2009, 26 INT S AUT ROB CON, P512, DOI DOI 10.22260/ISARC2009/0040
  • [8] Cheng M.Y., 2005, 22 INT S AUT ROB CON
  • [9] Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model
    Cheng, Min-Yuan
    Tsai, Hsing-Chih
    Hsieh, Wen-Shan
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (02) : 164 - 172
  • [10] Critical success factors for different project objectives
    Chua, DKH
    Kog, YC
    Loh, PK
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03): : 142 - 150