共 10 条
[1]
PLANNING HORIZONS FOR DYNAMIC LOT SIZE MODEL WITH BACKLOGGING
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 21 (03)
:251-255
[2]
EXTENSIONS OF PLANNING HORIZON THEOREM IN DYNAMIC LOT SIZE MODEL
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1969, 15 (05)
:268-277
[3]
PLANNING HORIZONS FOR PRODUCTION SMOOTHING WITH DETERMINISTIC DEMANDS .1. ALL DEMAND MET FROM REGULAR PRODUCTION
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:110-125
[4]
GENERAL PLANNING HORIZONS FOR PRODUCTION SMOOTHING WITH DETERMINISTIC DEMANDS .2. EXTENSIONS TO OVERTIME, UNDERTIME, AND BACKLOGGING
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 20 (07)
:1037-1046
[5]
LUNDIN R, 1973, THESIS U CHICAGO
[6]
PRICE-PRODUCTION DECISIONS WITH DETERMINISTIC DEMAND
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1970, 16 (11)
:747-750
[7]
VEINOTT AF, 1966, MANAGEMENT SCI, V12, pA745
[10]
BACKLOGGING MODEL AND A MULTI-ECHELON MODEL OF A DYNAMIC ECONOMIC LOT SIZE PRODUCTION SYSTEM - NETWORK APPROACH
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1969, 15 (09)
:506-527