Construction time and cost for post-tensioned timber buildings

被引:29
作者
Smith, T. [1 ]
Fragiacomo, M. [2 ]
Pampanin, S. [1 ]
Buchanan, A. H. [1 ]
机构
[1] Univ Canterbury, Christchurch, New Zealand
[2] Univ Sassari, Sassari, Italy
关键词
buildings; structures & design; timber structures;
D O I
10.1680/coma.2009.162.4.141
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes post-tensioned timber alternative designs for a six-storey office building in New Zealand. The building has long-span timber-concrete composite floors supported on laminated veneer lumber beams, columns and walls. Lateral loads are resisted with moment-resisting post-tensioned timber frames in one direction and post-tensioned cantilever timber walls in the other direction. This paper compares the time and cost of timber construction with the concrete building actually being constructed. Construction times of the timber and concrete buildings are found to be almost identical. The cost of the timber alternative is approximately 6% more than concrete or steel designs. This paper demonstrates the opportunity for post-tensioned timber to compete with concrete and steel for multistorey long-span office buildings, providing a more sustainable alternative.
引用
收藏
页码:141 / 149
页数:9
相关论文
共 23 条
[1]   Multi-storey prestressed timber buildings in New Zealand [J].
Department of Timber Design ;
不详 ;
不详 ;
不详 .
Struct Eng Int J Int Assoc Bridge Struct Eng, 2008, 2 (166-173) :166-173
[2]  
*CEN, 2003, 199511 CEN PREN
[3]   Posttensioned energy dissipating connections for moment-resisting steel frames [J].
Christopoulos, C ;
Filiatrault, A ;
Uang, CM ;
Folz, B .
JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2002, 128 (09) :1111-1120
[4]   Experimental Behavior of prestressed LVL-concrete composite beams [J].
Deam, Bruce L. ;
Fragiacomo, Massimo ;
Gross, L. Shane .
JOURNAL OF STRUCTURAL ENGINEERING, 2008, 134 (05) :801-809
[5]   Connections for composite concrete slab and LVL flooring systems [J].
Deam, Bruce L. ;
Fragiacomo, Massimo ;
Buchanan, Andrew H. .
MATERIALS AND STRUCTURES, 2008, 41 (03) :495-507
[6]  
Iqbal A., 2007, P 8 PAC C EARTHQ ENG
[7]  
Kelly J.M., 1972, BULL N Z SOC EARTHQ, V5, P63
[8]  
NEWCOMBE M., 2008, THESIS
[9]  
Palermo A., 2006, P 9 WORLD C TIMB ENG
[10]  
Palermo A., 2005, P NZSEE C WAIR NZ CD