ELASTIC-PLASTIC ANALYSIS OF CRACK IN THERMALLY-LOADED STRUCTURES

被引:45
作者
AOKI, S
KISHIMOTO, K
SAKATA, M
机构
关键词
D O I
10.1016/0013-7944(82)90118-7
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
引用
收藏
页码:405 / 413
页数:9
相关论文
共 50 条
[41]   ELASTIC-PLASTIC ANALYSIS OF A CRACK BY THE BODY FORCE METHOD: (TENSION OF AN INFINITE PLATE WITH A CRACK). [J].
Nisitani, Hironobu ;
Chen, Dai-Heng .
1600, (52)
[42]   COLLAPSE MODE OF ELASTIC-PLASTIC STRUCTURES [J].
GIAMBANCO, F ;
PANZECA, T ;
ZITO, M .
JOURNAL OF ENGINEERING MECHANICS-ASCE, 1992, 118 (06) :1083-1092
[43]   THEORY OF SHAKEDOWN OF ELASTIC-PLASTIC STRUCTURES [J].
KONIG, JA .
ARCHIWUM MECHANIKI STOSOWANEJ, 1966, 18 (02) :227-&
[44]   Topology optimization of elastic-plastic structures [J].
Leu, LJ ;
Huang, CW ;
Chou, JJ .
CHINESE JOURNAL OF MECHANICS-SERIES A, 2003, 19 (04) :431-442
[45]   Elastic-Plastic Analysis of Surface Crack in Round Bars under Torsion [J].
Ismail, A. E. ;
Ariffin, A. K. ;
Abdullah, S. ;
Ghazali, M. J. ;
Daud, R. .
FRACTURE AND STRENGTH OF SOLIDS VII, PTS 1 AND 2, 2011, 462-463 :651-+
[46]   ELASTIC-PLASTIC ANALYSIS OF FATIGUE CRACK CLOSURE IN MODES I AND II [J].
NAKAGAKI, M ;
ATLURI, SN .
AIAA JOURNAL, 1980, 18 (09) :1110-1117
[47]   Elastic-plastic Analysis and Failure Assessment of the Pipeline Steel with Surface Crack [J].
Wang Zhongxian ;
Zhang Ruifeng .
PROGRESS IN MATERIALS AND PROCESSES, PTS 1-3, 2013, 602-604 :2245-2248
[48]   ELASTIC-PLASTIC FINITE ELEMENT ANALYSIS UTILIZING DETAILED CRACK PROFILES [J].
Holloman, Ryan ;
Blanks, Daniel ;
Martinez, Miguel ;
Thorwald, Greg ;
Turnquist, Michael .
PROCEEDINGS OF ASME 2024 PRESSURE VESSELS & PIPING CONFERENCE, PVP2024, VOL 2, 2024,
[49]   Elastic-plastic analysis of biaxially loaded center-cracked plates [J].
O'Dowd, NP ;
Kolednik, O ;
Naumenko, VP .
INTERNATIONAL JOURNAL OF SOLIDS AND STRUCTURES, 1999, 36 (36) :5639-+
[50]   Crack Growth Direction Analysis Based on Elastic-Plastic Property of Material [J].
Yin Zhiping ;
Zhang Jiong ;
Guo Jin ;
Huang Qiqing .
HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 :101-106