共 17 条
[1]
Han, Na, Hogg, Real-Time Tool Control and Job Dispatching in Flexible Manufacturing Systems, International Journal of Production Research, 27 v, 8 n, pp. 1257-1267, (1989)
[2]
Stecke, Formulation and Solution of Nonlinear Integer Production Planning Problem for Flexible Manufacturing Systems, Management Science, 29 v, 3 n, pp. 273-288, (1983)
[3]
Shanker, Tzen, A Loading and dispatching Problem in a Random Flexible Manufacturing System, International Journal of Production Research, 23 v, 3 n, pp. 579-595, (1985)
[4]
Berrada, Stecke, A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems, Management Science, 32 v, 10 n, pp. 1316-1335, (1986)
[5]
Lashkari, Dutta, Padhye, A New Formulation of Operation Allocation Problem in Flexible Manufacturing Systems: Mathematical Modeling and Computational Experience, International Journal of Production Research, 25 v, 7 n, pp. 1267-1283, (1987)
[6]
Sarin, Chen, The Machine Loading and Tool Allocation Problem in a Flexible Manufacturing System, International Journal of Production Research, 25 v, 7 n, pp. 1081-1094, (1987)
[7]
Shanker, Srinivasulu, Some Solution Methodologies for Loading Problems in a Flexible Manufacturing System, International Journal of Production Research, 27 v, 6 n, pp. 1019-1034, (1989)
[8]
Wilson, An Alternative Formulation of the Operation-Allocation Problem in Flexible Manufacturing Systems, International Journal of Production Research, 27 v, 8 n, pp. 1405-1412, (1989)
[9]
Ram, Sarin, Chen, A Model and a Solution Approach for the Machine Loading and Tool Allocation Problem in a Flexible Manufacturing System, International Journal of Production Research, 28 v, 6 n, pp. 637-645, (1990)
[10]
Kim, Yano, Heuristic Approaches for Loading Problems in Flexible Manufacturing Systems, IEE Transactions, 25 v, 1 n, pp. 26-39, (1993)