Assessing labour-based construction works management processes

被引:2
|
作者
Nyando, Cleaverson K. [1 ]
Strasheim, Jacobus Alexander van Breda [2 ]
机构
[1] Univ Stellenbosch, Stellenbosch, South Africa
[2] Stellenbosch Univ, Stellenbosch, South Africa
关键词
developing countries; infrastructure planning; project management;
D O I
10.1680/mpal.10.00062
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The purpose of this paper was to assess the use of process protocol to analyse and identify the key sequential phases and documentation of the management processes of labour-based works in order to achieve a successful project and process execution. In order to achieve the above aim, a literature review of conference papers, reports, available project documents and limited interviews to officials involved in public works programmes were conducted. The analysis showed that there are seven phases with various deliverables spanning from phase zero to phase six. There are three most common operational levels of the management processes and these are subdivided into national level, integrated local level and project level. The process protocol-based phases consider the whole life cycle of a construction project while integrating the process elements under a common framework. Best practices in management of labour-based works have been used to follow and synthesise the process protocol approach to the management processes of labour-based works.
引用
收藏
页码:239 / 251
页数:13
相关论文
共 50 条
  • [41] The Study on Paradigm Shift of Project Management Based on Complexity Science -Project Management Innovations in Shanghai 2010 EXPO Construction Program
    He Qinghua
    Jiang Weiping
    Li Yongkui
    Le Yun
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 603 - 607
  • [42] CONSTRUCTION PROJECTS RISK ASSESSMENT BASED ON PERT, CPM AND PROJECT MANAGEMENT WITH FUZZY LOGIC TECHNIQUE
    Soni, Akash
    Kumar, Ramesh
    Shrivastava, Amit
    ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2022, 21 (09): : 5385 - 5395
  • [43] CONSTRUCTION 3D BIM-BASED KNOWLEDGE MANAGEMENT SYSTEM: A CASE STUDY
    Lin, Yu-Cheng
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (02) : 186 - 200
  • [44] Assessing of project management process knowledge area: procurement based on project management maturity model pmmm) (case study of pqr company)
    Putri, S. M.
    Pratami, D.
    Tripiawan, W.
    Rahmanto, G.
    1ST INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING, 2019, 505
  • [45] Self-Organizing Optimization of Construction Project Management Based on Building Information Modeling and Digital Technology
    Si, Jinlong
    Wan, Chao
    Hou, Liwei
    Qu, Yanan
    Lu, Yanhui
    Chen, Taiyu
    Yang, Kai
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2023, 47 (06) : 4135 - 4143
  • [46] Multi-Objective Optimization of Construction Project Management Based on NSGA-II Algorithm Improvement
    Yang, Yong
    Men, Jinrui
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2025, 16 (01) : 432 - 444
  • [47] Developing a Diamond Framework Model Based on "Integration" of Project Success Measures for Construction Project Management in Yemen
    Al-Kuhail, Muaadh Yahya
    Al-Dafiry, Hamoud Ahmed
    Barakat, Tarek Abdullah
    Al-Ansi, Abdulwahad
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 29 (03): : 1787 - 1810
  • [48] Self-Organizing Optimization of Construction Project Management Based on Building Information Modeling and Digital Technology
    Jinlong Si
    Chao Wan
    Liwei Hou
    Yanan Qu
    Yanhui Lu
    Taiyu Chen
    Kai Yang
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2023, 47 : 4135 - 4143
  • [49] Deep learning-based computer vision in project management: Automating indoor construction progress monitoring
    Ekanayake, Biyanka
    Wong, Johnny Kwok Wai
    Fini, Alireza Ahmadian Fard
    Smith, Peter
    Thengane, Vishal
    PROJECT LEADERSHIP AND SOCIETY, 2024, 5
  • [50] ASSESSING THE QUALITY OF PROJECT MANAGEMENT IN INDUSTRIAL ENTERPRISES WITHIN THE FRAMEWORK OF INDUSTRY 4.0 BASED ON THE INTEGRAL ENTROPY INDEX
    Pivneva, Svetlana
    Vaslavskaya, Irina
    Lapir, Mikhail
    Petrova, Olga
    Shichiyakh, Rustem
    Belova, Nadezhda
    REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2023, 23 (02): : 356 - 367