Assessing labour-based construction works management processes

被引:2
|
作者
Nyando, Cleaverson K. [1 ]
Strasheim, Jacobus Alexander van Breda [2 ]
机构
[1] Univ Stellenbosch, Stellenbosch, South Africa
[2] Stellenbosch Univ, Stellenbosch, South Africa
关键词
developing countries; infrastructure planning; project management;
D O I
10.1680/mpal.10.00062
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The purpose of this paper was to assess the use of process protocol to analyse and identify the key sequential phases and documentation of the management processes of labour-based works in order to achieve a successful project and process execution. In order to achieve the above aim, a literature review of conference papers, reports, available project documents and limited interviews to officials involved in public works programmes were conducted. The analysis showed that there are seven phases with various deliverables spanning from phase zero to phase six. There are three most common operational levels of the management processes and these are subdivided into national level, integrated local level and project level. The process protocol-based phases consider the whole life cycle of a construction project while integrating the process elements under a common framework. Best practices in management of labour-based works have been used to follow and synthesise the process protocol approach to the management processes of labour-based works.
引用
收藏
页码:239 / 251
页数:13
相关论文
共 50 条
  • [21] Mobile Internet based construction supply chain management: A critical review
    Shi, Qian
    Ding, Xue
    Zuo, Jian
    Zillante, George
    AUTOMATION IN CONSTRUCTION, 2016, 72 : 143 - 154
  • [22] Construction of Educational Quality Evaluation Index System Based on Project Management
    Dong, Yuan
    Zhang, ShiLun
    Huang, YuanLin
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS IN THE SERVICE SECTOR, 2020, 12 (02) : 65 - 75
  • [23] A method for the ontology-based risk management of PPP construction projects
    Jiang, Xiaoyan
    Wang, Sai
    Liu, Yong
    Xia, Bo
    Skitmore, Martin
    Nepal, Madhav
    Ghanbaripour, Amir Naser
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 1095 - 1129
  • [24] Discussion about the Construction Project Management Mode Based on the Contract Text
    Jiang, Yunxia
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3356 - 3361
  • [25] Construction of educational quality evaluation index system based on project management
    Dong Y.
    Zhang S.
    Huang Y.
    International Journal of Information Systems in the Service Sector, 2020, 12 (02): : 65 - 75
  • [26] Contribution of artificial intelligence (AI) to construction project management processes: State of the art with scoping review method
    Aladag, Hande
    Guven, Ilkim
    Balli, Osman
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2024, 42 (05): : 1654 - 1669
  • [27] STRUCTURING OF ECONOMIC PROCESSES IN MODERN PROJECT MANAGEMENT BASED ON DESIGN THINKING
    Oryekhov, Mykhaylo
    Harnaha, Oleksandr
    Mykhailova, Yelyzaveta
    Rubtsova, Oksana
    AD ALTA-JOURNAL OF INTERDISCIPLINARY RESEARCH, 2024, 14 (02): : 74 - 78
  • [28] Cost simulation in an item-based project involving construction engineering and management
    Chou, Jui-Sheng
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) : 706 - 717
  • [29] Developing project communities of practice-based knowledge management system in construction
    Lin, Yu-Cheng
    Lee, Hsin-Yun
    AUTOMATION IN CONSTRUCTION, 2012, 22 : 422 - 432
  • [30] Case-based reasoning and electromagnetism-like method in construction management
    Kartelj, Aleksandar
    Surlan, Nebojsa
    Cekic, Zoran
    KYBERNETES, 2014, 43 (02) : 265 - 280