Assessing labour-based construction works management processes

被引:2
|
作者
Nyando, Cleaverson K. [1 ]
Strasheim, Jacobus Alexander van Breda [2 ]
机构
[1] Univ Stellenbosch, Stellenbosch, South Africa
[2] Stellenbosch Univ, Stellenbosch, South Africa
关键词
developing countries; infrastructure planning; project management;
D O I
10.1680/mpal.10.00062
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The purpose of this paper was to assess the use of process protocol to analyse and identify the key sequential phases and documentation of the management processes of labour-based works in order to achieve a successful project and process execution. In order to achieve the above aim, a literature review of conference papers, reports, available project documents and limited interviews to officials involved in public works programmes were conducted. The analysis showed that there are seven phases with various deliverables spanning from phase zero to phase six. There are three most common operational levels of the management processes and these are subdivided into national level, integrated local level and project level. The process protocol-based phases consider the whole life cycle of a construction project while integrating the process elements under a common framework. Best practices in management of labour-based works have been used to follow and synthesise the process protocol approach to the management processes of labour-based works.
引用
收藏
页码:239 / 251
页数:13
相关论文
共 50 条
  • [1] Towards improved labour standards for construction of minor works in low income countries
    Cotton, A.
    Sohail, M.
    Scott, R.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2005, 12 (06) : 617 - +
  • [2] Assessing the efficiency of human resources management in construction projects
    El-Dash, Karim
    PROCEEDINGS OF 20TH IPMA WORLD CONGRESS ON PROJECT MANAGEMENT, VOLS 1 AND 2, 2006, : 270 - 278
  • [3] Assessing human resource management in construction projects in Kuwait
    El-Dash, Karim
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2007, 6 (01) : 65 - 71
  • [4] A criterion based audit of the management of obstructed labour in Malawi
    Kongnyuy, Eugene Justine
    Mlava, Grace
    van den Broek, Nynke
    ARCHIVES OF GYNECOLOGY AND OBSTETRICS, 2009, 279 (05) : 649 - 654
  • [5] Construction of Tourism Management Mode Based on Project Management Theory
    Hua, E.
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME 2017), 2017, 119 : 1055 - 1059
  • [6] Internet based collaborative project management for construction
    Cox, Robert F.
    2006 XI'AN INTERNATIONAL CONFERENCE OF ARCHITECTURE AND TECHNOLOGY, PROCEEDINGS: ARCHITECTURE IN HARMONY, 2006, : 981 - 985
  • [7] Construction Project Management Based on the Circular Economy
    Bondar, Olena
    Petrenko, Ganna
    Khalilov, Arzu
    Vahonova, Oleksandra
    Akimova, Liudmyla
    Akimov, Oleksandr
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2022, 22 (09): : 630 - 635
  • [8] Construction Management for Major Public Works: the case study of the water treatment plant of Standiana, Ravenna
    Baldoni, Paolo
    Govi, Guido
    Gambi, Andrea
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 133 - 162
  • [9] Assessing the performance of construction projects: Implementing earned value management at the General Services Administration
    Alvarado, Carlos
    Silverman, Robert
    Wilson, David
    JOURNAL OF FACILITIES MANAGEMENT, 2005, 3 (01) : 92 - +
  • [10] Assessing the Relationship between Constraint Management and Schedule Performance in Chilean and Colombian Construction Projects
    Lagos, Camilo, I
    Alarcon, Luis F.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (05)