SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH IDENTICAL FACILITIES IN PARALLEL USING GENETIC ALGORITHMS

被引:7
作者
Chang, Yu-Jen [1 ]
Yao, Ming-Jong [2 ]
机构
[1] Tunghai Univ, Dept Informat Management, Taichung, Taiwan
[2] Tunghai Univ, Dept Ind Engn & Enterprise Informat, Box 985,181 Taichung Kang Rd,Sect 3, Taichung, Taiwan
关键词
genetic algorithm; lot; scheduling; inventory; identical facilities;
D O I
10.1080/10170660809509075
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we solve the Economic Lot Scheduling Problem (ELSP) for a production system with identical facilities in parallel. The ELSP with identical facilities in parallel is concerned with the lot sizing, scheduling, and production assignment decision of n items so as to minimize the total costs per unit time. Since the ELSP with identical facilities in parallel is NP-hard, we propose two three-phase solution approaches based on the Genetic Algorithm (GA). In the first phase, we employ either Carreno's [5] heuristic or a GA to determine the assignment of n items to the identical facilities in parallel. Then, another GA utilizes the advantage of its multi-directional search ability to search for the candidate solutions (i.e., the replenishment cycles of the products) in the second phase. The third phase uses an efficient heuristic to test the feasibility of the candidate solutions and tries to generate a feasible production schedule for each facility. Based on our random experiments, our GA-based approaches are able to efficiently solve the ELSP with identical facilities in parallel within a reasonable run time, and their solution quality dominates Carreno's [5] heuristic.
引用
收藏
页码:91 / 104
页数:14
相关论文
共 31 条
[1]   THE G-GROUP HEURISTIC FOR SINGLE-MACHINE LOT SCHEDULING [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (03) :363-379
[2]  
Boesel J, 2003, IIE TRANS, V35, P221, DOI [10.1080/07408170304364, 10.1080/07408170390175459]
[3]   Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines [J].
Bollapragada, R ;
Rao, U .
MANAGEMENT SCIENCE, 1999, 45 (06) :889-904
[4]  
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[5]   ECONOMIC LOT SCHEDULING FOR MULTIPLE PRODUCTS ON PARALLEL IDENTICAL PROCESSORS [J].
CARRENO, JJ .
MANAGEMENT SCIENCE, 1990, 36 (03) :348-358
[6]  
Cormen T. H., 1993, INTRO ALGORITHMS
[7]   SCHEDULING ECONOMIC LOT SIZE PRODUCTION-RUNS [J].
DAVIS, SG .
MANAGEMENT SCIENCE, 1990, 36 (08) :985-998
[8]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[9]   OPTIMAL POWER-OF-2 REPLENISHMENT STRATEGIES IN CAPACITATED GENERAL PRODUCTION DISTRIBUTION NETWORKS [J].
FEDERGRUEN, A ;
ZHENG, YS .
MANAGEMENT SCIENCE, 1993, 39 (06) :710-727
[10]  
GENG PC, 1988, NAV RES LOG, V35, P605, DOI 10.1002/1520-6750(198808)35:4<605::AID-NAV3220350412>3.0.CO