Use of Management Techniques Technical Risks in a Software Development Company

被引:1
作者
Penha, Renato [1 ]
Kniess, Claudia Terezinha [2 ,3 ]
Bergman, Daniel Reed [4 ]
Biancolino, Cesar Augusto [5 ]
机构
[1] UNINOVE, Gestao Projetos, Sao Paulo, Brazil
[2] UNINOVE, Gestao Projetos, Programa Mestrado Profiss Adm, Sao Paulo, Brazil
[3] UNINOVE, Programa Mestrado Profiss Gestao Ambiental & Sust, Sao Paulo, Brazil
[4] UNINOVE, Programa Mestrado Profiss Gestao Projetos, Sao Paulo, Brazil
[5] UNINOVE, Programa Mestrado Profiss Adm, Gestao Sistemas Saude, Sao Paulo, Brazil
来源
REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY | 2014年 / 14卷 / 01期
关键词
Software Development; Technical Risks; Project Management;
D O I
10.20397/2177-6652/2014.v14i1.549
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Failures in project management translate into deviations in scope, within or cost affecting the profitability and feasibility of projects. Certain studies, such as those operated by Tao (2008), Dey, Kinch & Ogunlana (2007) and Chittister (1993) point out that one of the main risks in software development is associated with risks related to technical failures. As a consequence, projects have a completion date postponed to the date planned. As suggested in this article, risk management, contributing to the reduction of technical risks, to increase collaborates rate projects delivered on time completion planned. Given this context, this study aims to discuss the results of the use of risk management techniques employed in technical software development projects by a Brazilian market leader in Information Technology. Based on this approach are indicated factors that contributed to the reduction in the rate of diversion of time for completion of projects in the period 2005-2012. The results indicate that after the use of new techniques for employing qualified personnel in order to reduce delays hitherto occurred based on the adoption of technical project management in the construction of a historical basis for projects and the use of techniques for estimating activities in technical risk management, the company increased the percentage of projects delivered within 58.71% in 2005 to 70.70% in 2012. The results showed that a significant reduction in delays and cancellations of projects from new policies adopted under a significance level of 5%.
引用
收藏
页码:151 / 173
页数:23
相关论文
共 26 条
  • [1] Bergamini C. W., 1990, PSICOLOGIA APLICADA
  • [2] Software risk management
    Boehm, BW
    DeMarco, T
    [J]. IEEE SOFTWARE, 1997, 14 (03) : 17 - 19
  • [3] SOFTWARE RISK MANAGEMENT - PRINCIPLES AND PRACTICES
    BOEHM, BW
    [J]. IEEE SOFTWARE, 1991, 8 (01) : 32 - 41
  • [4] CARVALHO M. M., 2009, CONSTRUINDO COMPETEN
  • [5] Chittister C. H., 1993, IEE T SYSTEMS, P710
  • [6] Devore J. L., 2000, PROBABILITY STAT ENG
  • [7] Managing risk in software development projects: a case study
    Dey, Prasanta Kumar
    Kinch, Jason
    Ogunlana, Stephen O.
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2007, 107 (1-2) : 284 - 303
  • [8] Guimaraes R. C., 1997, ESTATISTICA
  • [9] Gusmao C., 2002, AN S BRAS QUAL SOFTW
  • [10] Risks to different aspects of system success
    Jiang, JJ
    Klein, G
    [J]. INFORMATION & MANAGEMENT, 1999, 36 (05) : 263 - 272