共 36 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[2]
Deb K., 2000, Parallel Problem Solving from Nature PPSN VI. 6th International Conference. Proceedings (Lecture Notes in Computer Science Vol.1917), P849
[3]
El-Gafy M., 2006, P JOINT INT C CONSTR, P128
[4]
Optimum planning of highway construction under A+B bidding method
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (04)
:261-269
[5]
Optimizing resource utilization for repetitive construction projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (01)
:18-27
[6]
El-Rayes K., 1998, CONSTR MANAG ECON, V16, P433