Scheduling Approach for the Simulation of a Sustainable Resource Supply Chain

被引:1
作者
Strubelt, Henning [1 ]
Trojahn, Sebastian [1 ]
Lang, Sebastian [1 ]
Nahhas, Abdulrahman [1 ]
机构
[1] Otto von Guericke Univ, Inst Logist & Mat Handling Syst, D-39106 Magdeburg, Germany
来源
LOGISTICS-BASEL | 2018年 / 2卷 / 03期
关键词
resource supply chain; waste disposal; mining; simulation; logistics processes; scheduling;
D O I
10.3390/logistics2030012
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The general goal of waste management is to conserve resources and avoid negative environmental impacts. This paper deals with the optimization of logistics processes at an underground waste storage site by means of solving scheduling issues and reducing setup times, with the help of a simulation model. Specific to underground waste storage is the fact that it is often only a side business to actual mining. With limited capacity and resources, all legal requirements must be met, while the business should still be profitable. This paper discusses the improvement of a logistical system's performance using machine scheduling approaches with the support of a plant simulation model. The process sequence is determined by means of a priority index. Genetic algorithms are then applied to improve the priority index to further increase performance. Results of the simulation model show that the performance of the logistics system can be increased by up to 400 percent, ensuring adequate system performance for current as well as future demand without changes to the system's capacities and resources.
引用
收藏
页数:11
相关论文
共 15 条
[1]  
Baker K.R., 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[2]   Metaheuristics in combinatorial optimization: Overview and conceptual comparison [J].
Blum, C ;
Roli, A .
ACM COMPUTING SURVEYS, 2003, 35 (03) :268-308
[3]   SEQUENCING 1 STATE-VARIABLE MACHINE - SOLVABLE CASE OF TRAVELING SALESMAN PROBLEM [J].
GILMORE, PC ;
GOMORY, RE .
OPERATIONS RESEARCH, 1964, 12 (05) :655-&
[4]  
Graham R. L., 1979, Discrete Optimisation, P287
[5]   Flowshop scheduling research after five decades [J].
Gupta, JND ;
Stafford, EF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (03) :699-711
[6]  
GUPTA SK, 1987, OMEGA-INT J MANAGE S, V15, P207, DOI 10.1016/0305-0483(87)90071-5
[7]  
Jahnke H., 1999, PLANUNG STEUERUNG PR, P228
[8]  
Lenstra J.K., 1977, ANN DISCRETE MATH, V1, P343, DOI [DOI 10.1016/S0167-5060(08)70743-X, /10.1016/S0167-5060(08)70743-X, 10.1016/S0167-5060(08)70743-X]
[9]   ADDRESSING THE GAP IN SCHEDULING RESEARCH - A REVIEW OF OPTIMIZATION AND HEURISTIC METHODS IN PRODUCTION SCHEDULING [J].
MACCARTHY, BL ;
LIU, JY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (01) :59-79
[10]  
Peters H.-J., 1997, ABFALLENTSORGUNG VER, V1st ed.