Start up, in the second half of 1989, of a crushing and injection installation ; rate of pulverized coal injection brought from 73 to 128 kg/thm from May to September, with 14 kg of coke oven gas. Actions for loading; maintaining an optimal gaseous distribution in the stack and heat losses within the aimed interval. Coke yield went from 375 to 325 kg/thm.