High reliability organizing at the boundary of the CM domain

被引:14
作者
Scholtenhuis, Leon L. Olde [1 ]
Doree, Andre G. [1 ]
机构
[1] Univ Twente, Fac Engn Technol, Dept Construct Management & Engn, POB 217, NL-7500 AE Enschede, Netherlands
关键词
Academic practice; high reliability organizing; management theory; research paradigm; safety;
D O I
10.1080/01446193.2014.913801
中图分类号
F [经济];
学科分类号
02 ;
摘要
The construction management (CM) domain regularly develops and explores new theories and perspectives. These new insights can shift the existing paradigm radically, they can be assimilated smoothly, or they can stall as they are debated at CM's domain boundary. During our current research, we experience that the concepts from high reliability organizing (HRO) are caught in such a debate. We elaborate this debate from the viewpoint of two distinctive scientific traditions and evaluate the main premises that hold HRO at CM's boundaries. It seems that reductionist scientific traditions underlie much of the critique which currently diverts debate off into an unproductive intellectual cul-de-sac. An alternative pragmatic approach would allow CM's HRO researchers to avoid the confines of the reductionist arguments as it redirects minds and action on productive and practical research to achieving more reliable construction project performance, as well as dealing better with health and safety issues. Above all, the examination of the HRO boundary debate in CM may help other researchers experiencing impasses in their debates to explore whether these debates address the actual notions at stake or are restricted by deeply held views rooted in scientific traditions.
引用
收藏
页码:658 / 664
页数:7
相关论文
共 47 条
[1]  
[Anonymous], 2007, J CONTING CRISIS MAN, DOI [10.1111/j.1468-5973.2007.00501.x, DOI 10.1111/J.1468-5973.2007.00501.X]
[2]  
Bigley GA, 2001, ACAD MANAGE J, V44, P1281, DOI 10.2307/3069401
[3]   Assessing NASA's Safety Culture: The Limits and Possibilities of High-Reliability Theory [J].
Boin, Arjen ;
Schulman, Paul .
PUBLIC ADMINISTRATION REVIEW, 2008, 68 (06) :1050-1062
[4]   The Legacy of the High Reliability Organization Project [J].
Bourrier, Mathilde .
JOURNAL OF CONTINGENCIES AND CRISIS MANAGEMENT, 2011, 19 (01) :9-13
[5]   From hero to hubris - Reconsidering the project management of Heathrow's Terminal 5 [J].
Brady, Tim ;
Davies, Andrew .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (02) :151-157
[6]   Advocating an ambivalent approach to theorizing the built environment [J].
Cairns, George .
BUILDING RESEARCH AND INFORMATION, 2008, 36 (03) :280-289
[7]  
Chan P. W., 2013, P 29 ANN ARCOM C REA, P1059
[8]  
Cheng E. W. L., 2001, Logistics Information Management, V14, P68, DOI 10.1108/09576050110363239
[9]  
Connaughton J, 2013, P 29 ANN ARCOM C ASS, P1125
[10]  
CREED WED, 1993, NEW CHALLENGES UNDER, P55