Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study

被引:0
|
作者
Zahraee, Seyed Mojib [1 ]
Hashemi, Ahmad [1 ]
Abdi, Ahmed Ali [1 ]
Shahpanah, Ataollah [1 ]
Rohani, Jafri Mohd [1 ]
机构
[1] Univ Teknol Malaysia, Fac Mech Engn, Dept Ind Engn, Utm Johor Bahru 81310, Johor, Malaysia
来源
JURNAL TEKNOLOGI | 2014年 / 68卷 / 03期
关键词
Lean manufacturing; value stream mapping; waste; assembly line;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lean Manufacturing (LM) is a business strategy that was developed in Japan. The main contribution of lean manufacturing is the identification and elimination of waste. Companies apply LM to sustain their competitiveness over their competitors by improving the manufacturing system's productivity and quality enhancement of the product. The goal of this paper is to apply one of the most significant lean manufacturing techniques called Value Stream Mapping (VSM) to improve the production line of a company that produces several components for vehicle assembly line by decreasing the waste and non-value added activities. First, the current value stream map of production line was developed using personal interviews, observations and secondary data of the company. Subsequently, the future value stream map was proposed based on the lean manufacturing principles to improve total production lead time and value added time. Based on the final result it can be concluded that VSM is a useful and applicable approach that can help managers conceptualize the different kind of wastes and defects. Final result showed that the production lead time and value added time improved up to nearly 80 % and 12 % respectively by eliminating the wastes based on lean principles and VMS method.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Incorporating Variability in Lean Manufacturing: A Fuzzy Value Stream Mapping Approach
    Liu, Qingqi
    Yang, Hualong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 (2020)
  • [22] IMPROVING LEAN MANUFACTURING SYSTEM USING VALUE STREAM MAPPING ANALYSIS
    Henny, H.
    Alhakim, Ghifari Syafiq
    Budi, Agus Heri Setya
    Aditya, Muhammad
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2023, 18 (04): : 1949 - 1956
  • [23] Improvement of Manufacturing Process Based on Value Stream Mapping: A Case Study
    Wang, Chia-Nan
    Vo, Tran Thi Bich Chau
    Chung, Yu-Chi
    Amer, Yousef
    Doan, Linh Thi Truc
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (03) : 300 - 318
  • [24] Extension of the Value Stream Mapping approach to the comprehensive design of a lean sheet metal manufacturing system: an industrial case study
    Matt, Dominik T.
    SHEET METAL 2013, 2013, 549 : 537 - 544
  • [25] Implementation of Lean Concepts Using Value Stream Mapping in Automotive Firm
    Deokar, Abhishek
    Raj, S. Aravind
    Jayakrishna, K.
    Zubar, H. Abdul
    ADVANCES IN MANUFACTURING TECHNOLOGY, 2019, : 141 - 147
  • [26] Lean manufacturing: costing the value stream
    Ruiz-de-Arbulo-Lopez, Patxi
    Fortuny-Santos, Jordi
    Cuatrecasas-Arbos, Lluis
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2013, 113 (05) : 647 - 668
  • [27] A Lean Manufacturing Procedure using Value Stream Mapping and the Analytic Hierarchy Process
    Dotoli, Mariagrazia
    Fanti, Maria Pia
    Rotunno, Giuliana
    Ukovich, Walter
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 1193 - 1198
  • [28] Lean manufacturing in agriculture: adapting the value stream mapping approach for farm management
    Carrijo, Pamella Rodrigues Silva
    Rader, Maria Luiza Bortolini
    Batalha, Mario Otavio
    Godinho Filho, Moacir
    OPERATIONS MANAGEMENT RESEARCH, 2024, 17 (04) : 1444 - 1468
  • [29] Application of lean manufacturing using value stream mapping in an auto-parts manufacturing unit
    Singh, Harwinder
    Singh, Amandeep
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2013, 10 (01) : 72 - 84
  • [30] Implementation of the Lean Model for Carrying out Value Stream Mapping and SMED in the Aerospace Engine Case Production
    Wang, Chen-hua
    Kao, Jar-Her
    Thakur, Sanjay Kumar
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 302 - +