SCHEDULING TASKS WITH DUE DATES IN A FABRICATION ASSEMBLY PROCESS

被引:25
作者
FAALAND, B
SCHMITT, T
机构
关键词
D O I
10.1287/opre.35.3.378
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:378 / 388
页数:11
相关论文
共 25 条
[1]   COMPARISON OF CAPACITY PLANNING TECHNIQUES IN A JOB SHOP CONTROL-SYSTEM [J].
ADAM, N ;
SURKIS, J .
MANAGEMENT SCIENCE, 1977, 23 (09) :1011-1015
[2]  
Anderson J. C., 1982, Production and Inventory Management, V23, P51
[3]  
Baker K., 1974, INTRO SEQUENCING SCH
[4]   SELECTION PROBLEM [J].
BALINSKI, ML .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 17 (03) :230-231
[5]  
BERRY WL, 1982, 8301 U WASH WORK PAP
[6]   THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE [J].
BERTRAND, JWM .
MANAGEMENT SCIENCE, 1983, 29 (07) :799-816
[7]  
BRYCE GR, 1980, DATA ANAL RUMMAGE US
[8]  
Collier D. A., 1981, Decision Sciences, V12, P85, DOI 10.1111/j.1540-5915.1981.tb00063.x
[9]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[10]  
ELVERS DA, 1973, J AM PRODUCTION INVE, V14, P62