共 8 条
- [1] Antill J.M., Woodhead R.W., Critical Path Methods in Construction Practice, (1982)
- [2] Burgess A.R., Killebrew J.B., Variation in activity level on a cyclical arrow diagram, J. Indust. Engrg, 13, 2, pp. 76-83, (1962)
- [3] Easa S.M., Resource leveling in construction by optimization, J. Constr. Engrg. and Mgmt, 115, 2, pp. 302-316, (1989)
- [4] Galbreath R.V., Computer program for leveling resource usage, J. Constr. Div, 91, 1, pp. 107-124, (1965)
- [5] Harris R.B., Precedence and Arrow Networks for Construction, (1978)
- [6] Moder J.J., Phillips C.R., Davis E.W., Project Management with CPM, PERT and Precedence Diagramming, (1983)
- [7] Phillips D., Garcia-Diaz A., Fundamentals of Network Analysis, (1981)
- [8] Wiest J.D., Levy F.K., A Management Guide to PERT/CPM, (1977)