PACKING METHOD FOR RESOURCE LEVELING (PACK)

被引:88
作者
HARRIS, RB
机构
[1] Dept. of Civ. Engrg., Univ. of Michigan, Ann Arbor, MI
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1990年 / 116卷 / 02期
关键词
D O I
10.1061/(ASCE)0733-9364(1990)116:2(331)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A new heuristic for resource leveling based upon the critical path method is developed. The minimum moment of the resource histogram is used to measure the level of resources. The heuristic assigns project activities to specific days so that the final resource histogram approaches a rectangle and its moment approaches a minimum value. Activities are listed in a priority order and all possible assignments for each are determined. Incremental moments contributed by the activity’s resource rate and penalties that recognize network interactions are calculated. Each activity is positioned in the time span where the sum of these quantities is a minimum. The histogram is thereby built step-by-step until all activities have been positioned within the constraints of a CPM or PERT network. The resulting leveled histogram is the same as, or very close to, that produced by other optimization or heuristic methods. The method is clear, logical, and computationally efficient whether the leveling is done manually or by computer. An example is solved to show the method’s details and an appendix provides a concise outline of the process. © ASCE.
引用
收藏
页码:331 / 350
页数:20
相关论文
共 8 条
  • [1] Antill J.M., Woodhead R.W., Critical Path Methods in Construction Practice, (1982)
  • [2] Burgess A.R., Killebrew J.B., Variation in activity level on a cyclical arrow diagram, J. Indust. Engrg, 13, 2, pp. 76-83, (1962)
  • [3] Easa S.M., Resource leveling in construction by optimization, J. Constr. Engrg. and Mgmt, 115, 2, pp. 302-316, (1989)
  • [4] Galbreath R.V., Computer program for leveling resource usage, J. Constr. Div, 91, 1, pp. 107-124, (1965)
  • [5] Harris R.B., Precedence and Arrow Networks for Construction, (1978)
  • [6] Moder J.J., Phillips C.R., Davis E.W., Project Management with CPM, PERT and Precedence Diagramming, (1983)
  • [7] Phillips D., Garcia-Diaz A., Fundamentals of Network Analysis, (1981)
  • [8] Wiest J.D., Levy F.K., A Management Guide to PERT/CPM, (1977)