共 14 条
[1]
Aeberli U., 1978, P 3 INT C INT ASS EN, V2, P7
[2]
[Anonymous], 1964, INT J ROCK MECH MIN, DOI [10.1016/0148-9062(64)90005-1, DOI 10.1016/0148-9062(64)90005-1]
[3]
[Anonymous], 1973, ROCK MECH, DOI DOI 10.1007/BF01301795
[4]
BLINDHEIM OT, 1978, 6 U TRONDH GEOL I RA
[5]
SIZE CORRECTION FOR POINT LOAD TESTING
[J].
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES,
1980, 17 (04)
:231-235
[6]
BROOK N, 1977, P C ROCK ENG, P35
[7]
DUBUGNON O, 1981, TUNNEL 81, P37
[8]
KUTTER H, 1982, TUNNELLING 82, P127
[9]
NIZAMOGLU YS, 1978, THESIS I NAT POLYTEC
[10]
OUCHTERLONY F, 1974, 3RD P C INT SOC RO B, V2, P1377