共 18 条
[1]
Al Shawi M., Jaggar M.D., Brandon P.S., An expert system to assist in generation and scheduling of construction activities, Proc., CIB 90, Build. Economics and Constr. Mgmt, 2, pp. 375-384, (1990)
[2]
Arditi D., Abulak Z., Line of balance scheduling in pavement construction, J. Constr. Engrg. and Mgmt, 112, 3, pp. 411-422, (1986)
[3]
Darwich A., Levitt R.E., Hayes-Roth B., OAR PLAN generating projects plans by reasoning about objects, action and resources, Artificial Intelligence in Engrg. Des. and Manufacturing, 2, 3, pp. 169-181, (1990)
[4]
De La Garza I., Ibbs C.W., A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise buildings, Tech. Rep, 23, (1988)
[5]
De La Garza J., Ibbs C.W., … Knowledge elicitation study in construction scheduling domain, J. Computing in Civ. Engrg, 4, 2, pp. 135-154, (1990)
[6]
Echeverry D., Ibbs C.W., Kim S., Sequencing knowledge for construction scheduling, J. Constr. Engrg. and Mgmt, 117, 1, pp. 118-130, (1992)
[7]
Kakhonen K., Lariba P., A computer program for generating and managing schedules for construction projects, Proc., 7th Int. Symp. on Automation and Robotics in Constr, pp. 311-312, (1990)
[8]
Levitt R.E., Kartam N.A., Kuntz J.C., Artificial intelligence techniques for generation of construction plans, J. Constr. Engrg. and Mgmt, 114, 3, pp. 329-343, (1988)
[9]
Monograph on planning and environmental criteria for tall buildings, (1981)
[10]
Monograph on tall buildings and concepts, (1980)