共 6 条
- [1] PREEMPTIVE SCHEDULING OF UNIFORM PROCESSOR SYSTEMS [J]. JOURNAL OF THE ACM, 1978, 25 (01) : 92 - 101
- [2] Graham R. L., 1979, Discrete Optimisation, P287
- [3] Lawler E. L., 1979, Mathematics of Operations Research, V4, P339, DOI 10.1287/moor.4.4.339
- [4] Lawler E. L., 1983, MATH PROGRAMMING STA, P202
- [5] LAWLER EL, 1979, BW10679 MATH CTR REP