Using Building Information Modelling to achieve Lean principles by improving efficiency of work teams

被引:69
作者
Zhang, Xun [1 ]
Azhar, Salman [1 ]
Nadeem, Abid [2 ]
Khalfan, Malik [3 ,4 ]
机构
[1] Auburn Univ, McWhorter Sch Bldg Sci, Auburn, AL 36849 USA
[2] Nazarbayev Univ, Dept Civil Engn, Astana, Kazakhstan
[3] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic, Australia
[4] Khalifa Univ, Dept Civil Infrastruct & Environm Engn, Abu Dhabi, U Arab Emirates
关键词
Building Information Modelling; construction projects; Lean construction;
D O I
10.1080/15623599.2017.1382083
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Both Building Information Modelling (BIM) and Lean principles have significant impact on efficiency and effectiveness during a project development process within the construction industry. It is widely accepted that BIM can be used as a tool to help reduce project cost; shorten project duration by optimizing the construction sequence; improving the coordination of project teams; providing communication platform for different disciplines; etc. A further exploration can be made to find out whether BIM can be used as a tool to help project teams to achieve the Lean principles. In this research, a hypothesis was developed to validate if BIM can be used as a tool to achieve the principles of Lean construction by improving the construction productivity during a project. Several metrics were investigated to measure the contributions of BIM towards project productivity. By analysing a case study, this paper explores the connection between BIM and Lean principles; the contribution of BIM in the improvement of coordination and collaboration of work teams; enhancement of project quality; and reduction of waste and cost.
引用
收藏
页码:293 / 300
页数:8
相关论文
共 19 条
[1]   Requirements for BIM platforms in the concrete reinforcement supply chain [J].
Aram, Shiva ;
Eastman, Charles ;
Sacks, Rafael .
AUTOMATION IN CONSTRUCTION, 2013, 35 :1-17
[2]   Building information modelling (BIM): now and beyond [J].
Azhar, Salman ;
Khalfan, Malik ;
Maqsood, Tayyab .
CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (04) :15-28
[3]   Applying lean thinking in construction and performance improvement [J].
Aziz, Remon Fayek ;
Hafez, Sherif Mohamed .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (04) :679-695
[4]  
Clemente J., 2013, P 21 ANN C INT GROUP
[5]  
Dave B, 2013, P 21 ANN C INT GROUP
[6]  
Eastman C, 2008, BIM HDB GUIDE BUILDI
[7]  
Engineers Australia WA Division, 2012, REC PRACT APPL LEAN
[8]  
Gerber D.J., 2010, P 18 INT GROUP LEAN
[9]  
Koskela L., 2002, J CONSTR RES, V3, P1, DOI [10.1142/S1609945102000035, DOI 10.1142/S1609945102000035]
[10]   Delays and cost increases in the construction of private residential projects in Kuwait [J].
Koushki, P. A. ;
Al-Rashid, K. ;
Kartam, N. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (03) :285-294